Orange County NC Website
9 <br /> Desi n <br /> Construction <br /> Equipment <br /> Land-Right of Wa <br /> Other <br /> TOTAL CAPITAL COSTS <br /> Assumptions for Costs and Revenues Above: <br /> 10.Please state any assumption(s)used to calculate the capital and operating dollars and revenues shown above.(include details) <br /> Values in table 8 reflect total cast of Route 800.Incremental costs are reflected in tables 1-3 and in project sheet header block. <br /> eac orz tVzso�scr�,�rw�ao� <br />