Browse
Search
2026-054-E-AMS-Harrod & Assoc. Constructors-Provide and Install Leveling Agent to Dental Flooring, SHSC Plans Review Fee with TOCH
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2026
>
2026-054-E-AMS-Harrod & Assoc. Constructors-Provide and Install Leveling Agent to Dental Flooring, SHSC Plans Review Fee with TOCH
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/12/2026 3:07:26 PM
Creation date
2/12/2026 3:02:02 PM
Metadata
Fields
Template:
Contract
Date
2/3/2026
Contract Starting Date
2/3/2026
Contract Ending Date
2/10/2026
Contract Document Type
Contract
Amount
$23,100.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
444
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Orange County Health Department Improvements Smith Sinnett / 2024008 <br />Hillsborough, NC Orange County Asset Management Services <br /> <br /> <br />SUPPLEMENTARY GENERAL CONDITIONS 00 73 00 - 2 <br /> <br />13.18.2 Time for Completion of final inspection items after Substantial Completion shall be thirty (30) <br />Days after final inspection list is received by the Contractor. After thirty (30) days, upon seven (7) <br />days written notice, the Owner shall have the option to correct or conclude any and all final <br />inspection items not completed by the Contractor to the satisfaction of the Architect and the <br />Owner within thirty (30) days from the actual date of substantial completion by utilizing its own <br />forces or hiring others. The cost of correcting such remaining final inspection items by the Owner <br />or others shall be deducted from the final payment to the Contractor. <br /> <br /> For each consecutive calendar day that the Work remains incomplete after the date established <br /> for Final Completion, the Owner will retain from compensation otherwise to be paid to the <br /> Contractor the sum of Five Hundred Dollars ($500.00). This amount is the minimum <br /> measure of damages the Owner will sustain by failure of the Contractor to complete all <br /> remedial work, correct deficient work, clean up the project and other miscellaneous tasks as <br /> required to complete all work specified. This amount is separate from the liquidated damages <br /> prescribed above under paragraph 9.11. <br /> <br />END OF SECTION 00 73 00 <br /> <br />Docusign Envelope ID: 186E0FF8-664C-4A5C-9F97-28196CE69FD1Docusign Envelope ID: 01F429D6-252B-4D8E-984E-70B5432F90BA
The URL can be used to link to this page
Your browser does not support the video tag.