Browse
Search
2026-052-E-AMS-MBP Facility Solutions-Gateway - Elevator Commissioning
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2026
>
2026-052-E-AMS-MBP Facility Solutions-Gateway - Elevator Commissioning
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/12/2026 3:00:48 PM
Creation date
2/12/2026 3:00:40 PM
Metadata
Fields
Template:
Contract
Date
2/10/2026
Contract Starting Date
2/10/2026
Contract Ending Date
2/12/2026
Contract Document Type
Contract
Amount
$27,200.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />MBP Facility Solutions, LLC <br />2600 Park Tower Drive, Suite 801 | Vienna, Virginia 22180 | 703-641-9088 | www.mbpce.com <br /> <br />November 7, 2025 <br />Orange County Government <br />Asset Management Services <br />306 Revere Road <br />Hillsborough, NC 27278 <br /> <br />Attention: Angel Barnes, Asset Management Services <br />Reference: Orange County Gateway Center <br /> Proposal for Building Elevator Inspection <br />Dear Mr. Dorman, <br />MBP Facility Solutions, LLC (“MBP-FS”) is pleased to submit this proposal to provide building elevator <br />inspection services (“Proposal”) to Orange County Government, Asset Management Services <br />(“County”) for the Gateway Center located at 228 S Churton St in Hillsborough, NC. MBP-FS will <br />partner with Metro Elevator to provide these services. <br /> <br />SCOPE OF PROJECT <br />The recently modernized elevator at the Gateway Center has experienced intermittent operational <br />issues following completion of the upgrade. The County has expressed concern that the elevator may <br />malfunction and potentially trap occupants. <br />MBP-FS’ subcontractor, Metro Elevator, will evaluate the elevator’s operation to identify potential <br />causes of irregular performance or risk of entrapment. The investigation will include a review of the self- <br />leveling function, control programming, and any physical or mechanical components that could <br />contribute to improper leveling or safety concerns. <br />MBP-FS will issue a report summarizing observations, findings, and recommendations for corrective <br />action to improve reliability and occupant safety. <br /> <br />SCOPE OF WORK (SOW) <br />MBP-FS’ Subcontractor Metro Elevator will: <br />1. Functional Review <br />a. Evaluate elevator system components, including car operation, door function, control logic, <br />and safety systems. <br />b. Review the elevator’s self-leveling programming and confirm its current operating <br />frequency, calibration, and effectiveness. <br />c. Identify any irregularities in ride quality, door leveling, or system response that could <br />contribute to passenger entrapment or safety concerns. <br />d. Observe and document any abnormal behavior, fault codes, or interruptions during <br />operation. <br />Docusign Envelope ID: 4A1EBC2C-12B0-45FA-8C6E-0273D0CBC06A
The URL can be used to link to this page
Your browser does not support the video tag.