Orange County NC Website
33 <br /> Planning and Inspections <br /> Activity Current Fee Proposed Fee Alamance County Buncombe County Catawba County Chapel Hill(city) Chatham County Durham <br /> Department <br /> Non- <br /> Development <br /> Development <br /> Trade Permits(MEP) Not listed on Electrical: Electrical:$120 $80 per Based on Electric:$60 Electric:$100- Electrical:$115 Electric:$200 $75/trade $75/trade Electrical: Electrical: $75 Calculated <br /> shared fee $0.25/Amp up to 200 instance Commercial ($75 for new 150($150 for Mechanical: Mechanical: ($100 MIN) ($100 MIN) $156(100- $156(100- (Single Fee based on <br /> schedule Mechanical:$90 amps;$180 $160 Multiple Fees(Not service) new service) $70-100 based $100-135 200amp),$187 200amp),$187 for ALL project cost <br /> Plumbling:$90 exceeding 200 Trades Specified) Mechanical:$60- Mechanical: on service based on (400amp) (400amp) Trades) for EACH <br /> amps 75 per service, $60-100($3000 Plumbing:$10- service Mechanical: Mechanical: trade <br /> Mechanical: $275 MAX MAX) 100($50 MIN) Plumbing:$15- $50-125 based $0.058/sf($98 $0-1500:$75 <br /> Dependent on Plumbing:$60 Plumbing:$60 150($75 MIN) on service MIN,$3000 $75001 M: <br /> service, ($275 MAX) ($3000 MAX) Plumbing:$170 MAX) $6314 <br /> typically by Plumbing: $1 M+:$6314 <br /> BTU $7.90/fixture +0.15%of <br /> Plumbing:$90- ($187 MIN) each added <br /> 120 1 $M to project <br /> Subdivision Review Minor-Concept: Minor(Up to 14 Minor(Up to 14 Minor(4-10 Minor(4-10 Minor:$65 Minor:$65 Minor:$1050+ Minor:$1050+ Minor(<5 Minor(<5 lots): Minor:$624(2- Minor:$624(2- Preliminary <br /> $150+$25/lot lots):$160+$40/lot lots):$160+ lots):$100+ lots):$100+ Major:$200+ Major:$200+ +68/lot +68/lot lots):$250 $250 6lots) 6lots) Preliminary Review: <br /> Minor-Final:$200 Major(More than 14 $40/lot $10/lot $10/101 $5/lot $5/lot Major:$9465+ Major:$9465+ Major:$500 Major:$500+ Major:$1248+ Major:$1248+ Review: $1000 <br /> +$25/lot lots):$200+$50/lot Major(More Major(11 or Major(11 or 331/lot 331/lot +$50/lot $50/lot $52/new lot $52/new lot $1000 Final Review: <br /> than 14 lots): More):$200+ More):$200+ Final $600 <br /> Major- $200+$50/lot $15/lot $15/lot Review: <br /> Preliminary:$400 $600 <br /> +$50/lot <br /> Major-Concept: <br /> $600+$50/lot <br /> Major-Final:$500 <br /> +$25/lot <br /> Zoning Compliance Residential:$55 Not Separate Permit, Not Separate Zoning Zoning By building Type By building $1330+ $1330+ $50 $500 Zoning Zoning $50 $50 <br /> Permit New Towers: Handled through Permit, Determination Determination $25-$50 Type $16/100SF $16/100SF Verification Verification <br /> $1000 Building Permit Handled Letter Letter $50-$200 Letter: Letter: <br /> $35:Zoning Letter through $35 $35 $26/address $26/address <br /> Building Permit <br /> $35:Zoning <br /> Letter <br /> Map Amendment $550 Not required in most Not required in $500 $500 $720 $720 $1390+ $1390+ $750+ $750+ $3562:<5acres $3562:<5acres $1,000 $1,000 <br /> area most area $68/acre $68/acre $25/acre $25/acre $4602:5+ $4602:5+ <br /> Some areas might Some areas acres acres <br /> require might require <br /> Erosion Control Plan $450+ $119 per Acre $119 per Acre 0.25-1 acre: 0.25-1 acre: <1acre:$50 <1 acre:$50 $450+ $450+ $250/acre $250/acre <2000SF:No <2000SF:No Lesser of: $250/acre <br /> Review $450/acre $100 $100 (permit only) (permit only) $450/acre $450/acre plan req. plan req. $100/lot <br /> 1+acre:$525 1+acre:$525 1+acre:$200+ 1+acre:$200+ 20000SF- 20000SF- OR <br /> Per Acre, Per Acre, $150/acre $150/acre 1 acre:$100 1 acre:$100 $250/acre <br /> Prorated Prorated 1+acre: 1+acre: <br /> $125/acre $125/acre <br /> MGVT PAGE 29 <br />