Browse
Search
Agenda 02-10-2026; 2 - Presentation of Fee Study for Emergency Services, Planning & Inspections, and Environment, Agriculture, Parks and Recreation (DEAPR)
OrangeCountyNC
>
BOCC Archives
>
Agendas
>
Agendas
>
2026
>
Agenda - 02-10-2026 Work Session
>
Agenda 02-10-2026; 2 - Presentation of Fee Study for Emergency Services, Planning & Inspections, and Environment, Agriculture, Parks and Recreation (DEAPR)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/5/2026 11:54:06 AM
Creation date
2/5/2026 11:47:36 AM
Metadata
Fields
Template:
BOCC
Date
2/10/2026
Meeting Type
Work Session
Document Type
Agenda
Agenda Item
2
Document Relationships
Agenda for February 10, 2026 Work Session
(Message)
Path:
\BOCC Archives\Agendas\Agendas\2026\Agenda - 02-10-2026 Work Session
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
21 <br /> 90 Rooftop Heliports S 50 S 210 24% $ S S <br /> 91 Scra p Ti re Sto rag e $ 50 $ 210 24% $ S $ <br /> 92 Spraying/Dipping S 50 $ 419 12% $ $ S <br /> 93 Stop Work Order Fine S 250 4 S 210 119% S 838 S 1,000 S 162 <br /> 94 Tank Install 1 Removal S 200 3 $ 838 24% S 2,515 $ 600 $ 1,915 <br /> 95 Tank Install f Removal per additional tank S 25 S 210 12% S - $ - S <br /> 96 Tem porary Tents l Canopy per S 50 9 S 210 24% $ 1,886 S 450 $ 1,436 <br /> 97 Tire-Rebuilding Plants S 50 S 210 24% S $ S <br /> 98 Waste Handling S 50 $ 210 24% S $ 5 <br /> 99 Woad Products S 50 S 210 24% S $ S <br /> 100 Fa i I u re to obta i n p roper perm it $ - S 210 0% S $ S <br /> 101 1st Violation $ 750 - $ 210 358% $ <br /> 1,02 2nd Violation $ 1,500 S 210 716% S S S <br /> 103 3rd and Subsequent Violations $ 2„500 $ 2.10 1193% S $ S <br /> 104 Required Constmction Remit Fees <br /> 105 ABC Permit Inspections S - 6 $ 314 0% $ 1,886 S $ 1,886 <br /> 106 Alternative Fire Extinguishing Systems S 150 S 210 72% S S $ - <br /> 107 AutaFire.Extinguishing System S 0 11 $ 419 0% $ 4,611 S 0 S 4,611 <br /> 108 BatterySystems $ 150 S 210 72% $ - $ $ - <br /> 109 Compressed Gas $ 150 S 210 72% S - S S <br /> 110 Cryogenic Fluids $ 150 - $ 210 72% $ - $ - $ - <br /> 111 Fire Alarm/Oetect.Install S 0 18 S 419 0% S 7,546 S 0 S - <br /> 112 Fire Extinguisher Class S 20 $ 419 5% S $ S <br /> 113 Fire Pump S 500 S 419 119% S $ S <br /> 114 Fit Testing S 50 $ 210 24% S S S <br /> 115 Flammable/Combustible S 175 $ 210 93% S S $ <br /> 116 Gates and barricades acrossfreapparatus access roads S 150 $ 210 72% $ $ $ <br /> 117 Hazardous Materials $ 50 $ 629 8% $ $ S <br /> 118 Hazardous Materials Mitigation $ - S 210 0% S S S <br /> 119 Industrial Ovens $ 150 $ 210 72% $ $ $ <br /> 120 Life Safety Plan Review S 200 $ 419 48% $ S S <br /> 121 LP Gas S 50 S 210 24% $ $ $ <br /> 122 Private Fire Hydrant S 150 S 210 72% S $ S <br /> 123 Spraying/Dipping S 150 S 210 72'% $ $ S <br /> 124 Standpipe Systems $ 200 $ 210 95% S $ $ <br /> 125 Tents/Membranes $ 100 $ 210 48% S S S <br /> 126 Add itionaITent $ 25 - $ - 0% $127,14 n Fee-Related Activities S 1 S 303,562 0% S 303,562 S S 303,5-62 <br /> TotaI User Fees S 371,965 S 74,765 S 297200 <br /> 1%of Full Cost 1 20% 80% <br /> MC-PT PAGE 17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.