Browse
Search
Agenda 02-03-2026; 8-h - Approval of Prequalification Assessment Tool for the Crisis Diversion Facility
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2020's
>
2026
>
Agenda - 02-03-2026 Business Meeting
>
Agenda 02-03-2026; 8-h - Approval of Prequalification Assessment Tool for the Crisis Diversion Facility
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/29/2026 3:42:52 PM
Creation date
1/29/2026 3:57:58 PM
Metadata
Fields
Template:
BOCC
Date
2/3/2026
Meeting Type
Business
Document Type
Agenda
Agenda Item
8-h
Document Relationships
Agenda for February 3, 2026 BOCC Meeting
(Message)
Path:
\Board of County Commissioners\BOCC Agendas\2020's\2026\Agenda - 02-03-2026 Business Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Gilbane Building Company 14 <br /> Prequalification Form for First-Tier Subcontractors under CM at Risk <br /> Orange County Crisis Diversion Facility <br /> 2.10c Safety—Written Plan,Training, Inspections <br /> Does your company have a written Safety/Health Program and required Drug Testing Program? IAYes =No <br /> Does your company provide weekly safety and health training to your on-site employees? IAYes ONo <br /> Does your company perform weekly safety and health inspections of the workplace? DYes =No <br /> (Prequalification Ratings Matrix. Give 3 points for each yes response above,for a maximum of 9 points.) <br /> 2.11. Documented HUB Plan <br /> Does this company currently have a documented plan for engaging subcontractor participation from Historically <br /> Underutilized Businesses? DYes ONo If yes, company HUB Plan may be requested by Gilbane. <br /> (Prequalification Ratings Matrix: if company has a current,documented HUB plan give 4 points. If no,give 0 points.) <br /> SECTION 3. Project Specific Staff <br /> 3.1. Superintendent Resume <br /> The assigned project superintendent for this project shall be: <br /> Include a resume. Have you included a resume? DYes =No <br /> (Prequalification Ratings Matrix: If resume included,give 2 points. If no,give 0 points.) <br /> 3.2. Superintendent Experience <br /> The years of experience this superintendent has on this specific project type is_<1 _1-2 _3-4 _5 or more <br /> (Prequalification Ratings Matrix: If<1 give 0 points,if 1-2,give 0.5 point,3-4 give 1 point,if 5 or more give 2 points.) <br /> 3.3. Project Manager Resume <br /> The assigned project manager for this project shall be: <br /> Include a resume. Have you included a resume? DYes =No <br /> (Prequalification Ratings Matrix: If resume included,give 2 points. If no,give 0 points.) <br /> 3.4. Project Manager Experience <br /> The years of experience the project manager has on this specific project type is_<1 _1-2 _3-4 _5 or more <br /> (Prequalification Ratings Matrix: If<1 give 0 points,if 1-2,give 0.5 point,3-4 give 1 point,if 5 or more give 2 points.) <br /> Page 10 112 <br />
The URL can be used to link to this page
Your browser does not support the video tag.