Orange County NC Website
21 <br /> Projects use the construction manager at risk method unless another method is <br /> determined to be in the best interest of the project in accordance with G.S. 143-128(a1). <br /> Project construction contracts will be paid as provided in the construction contract <br /> documents approved by the County and will be paid utilizing general obligation bond <br /> funds. <br />