Browse
Search
Agenda 02-03-2026; 8-h - Approval of Prequalification Assessment Tool for the Crisis Diversion Facility
OrangeCountyNC
>
BOCC Archives
>
Agendas
>
Agendas
>
2026
>
Agenda - 02-03-2026 Business Meeting
>
Agenda 02-03-2026; 8-h - Approval of Prequalification Assessment Tool for the Crisis Diversion Facility
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/29/2026 3:42:52 PM
Creation date
1/29/2026 3:32:30 PM
Metadata
Fields
Template:
BOCC
Date
2/3/2026
Meeting Type
Business
Document Type
Agenda
Agenda Item
8-h
Document Relationships
Agenda for February 3, 2026 BOCC Meeting
(Message)
Path:
\BOCC Archives\Agendas\Agendas\2026\Agenda - 02-03-2026 Business Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Gilbane Building Company 15 <br /> Prequalification Form for First-Tier Subcontractors under CM at Risk <br /> Orange County Crisis Diversion Facility <br /> 3.5. Current and Similar Project Experience <br /> IF YOUR COMPANY HAS WORKED ON ANY PROJECT WITHIN THE LAST 5 YEARS WITH GILBANE,YOU MUST LIST <br /> THAT PROJECT BELOW. IF YOU HAVE PROVIDED A GILBANE REFERENCE, NO ADDITIONAL REFERENCES ARE <br /> REQUIRED. <br /> IF YOUR COMPANY HAS NOT WORKED WITH GILBANE IN THE LAST 5 YEARS,YOU MUST LIST 2 CURRENT PROJECT <br /> REFERENCES AND 1 SIMILAR PROJECT REFERENCE WITHIN THE LAST 5 YEARS. Failure to provide current contact <br /> information for references will impact points given by Prequalification Committee. <br /> 1.GILBANE or Current Project <br /> Owner Name/Representative <br /> Owner Phone Number/Email <br /> Designer Name/Representative <br /> Designer Phone Number/Email <br /> CM/GC Name/Representative <br /> CM/GC Phone Number/Email <br /> Contract Dollar Amount <br /> Scope of Work <br /> Percentage Complete <br /> Anticipated Completion Date <br /> 2.Current Project Name <br /> Owner Name/Representative <br /> Owner Phone Number/Email <br /> Designer Name/Representative <br /> Designer Phone Number/Email <br /> CM/GC Name/Representative <br /> CM/GC Phone Number/Email <br /> Contract Dollar Amount <br /> Scope of Work <br /> Percentage Complete <br /> Anticipated Completion Date <br /> 3.Similar Project Name: <br /> Owner Name/Representative <br /> Owner Phone Number/Email <br /> Designer Name/Representative <br /> Designer Phone Number/Email <br /> CM/GC Name/Representative <br /> CM/GC Phone Number/Email <br /> Contract Dollar Amount <br /> Scope of Work <br /> Percentage Complete <br /> Anticipated Completion Date <br /> (Prequalification Ratings Matrix: For projects above,give up to 15 points per Gilbane reference for a maximum of 15 points. <br /> If Gilbane reference is not provided,give up to 5 points per 1 positive current and similar reference for a maximum of 15 <br /> points from the Construction Manager/General Contractor. If company contracted directly with the Owner, Gilbane will <br /> contact Owner for reference information.) <br /> Page 11 1 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.