Browse
Search
Minutes 11-14-2025-Work Session
OrangeCountyNC
>
Board of County Commissioners
>
Minutes - Approved
>
2020's
>
2025
>
Minutes 11-14-2025-Work Session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/22/2026 8:50:46 AM
Creation date
1/22/2026 8:45:56 AM
Metadata
Fields
Template:
BOCC
Date
11/14/2025
Meeting Type
Work Session
Document Type
Minutes
Document Relationships
1 & 2 - Orange County Land Use Plan 2050 – Board Request for Additional Information
(Attachment)
Path:
\Board of County Commissioners\BOCC Agendas\2020's\2025\Agenda - 11-14-2025 BOCC Mini-Retreat
Agenda for November 14, 2025 Mini-Retreat Meeting
(Attachment)
Path:
\Board of County Commissioners\BOCC Agendas\2020's\2025\Agenda - 11-14-2025 BOCC Mini-Retreat
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
34 <br /> Slide #26 <br /> Commissioner Questions cont. <br /> • Impacting other wells? <br /> • All wells run the risk of impacting other wells, community or private. <br /> Community wells are typically focused on due to the higher demand they <br /> require with more residences connected. However, the increased <br /> efficiency of operators and distribution systems with the higher scruple of <br /> regulatory agencies means they are also generally maintained and <br /> monitored to a higher degree than private wells. <br /> • 24-hour drawdown tests performed on community wells are a great <br /> opportunity to monitor nearby wells for fracture interconnectivity. <br /> Slide #27 <br /> Commissioner Questions cont. <br /> • Costs to drill? <br /> • This can varywidely, but the major expenses in drilling are the surface casing,well <br /> diameter,and depth requirements. <br /> • Wells with 100'or more surface casing become very expensive due to specialty <br /> equipment holding the borehole stable during casing installation and the expense of <br /> larger piping materials for the casing. <br /> • Deeper wells are more expensive as greater depths frequently correlate with Longer drill <br /> times. Footage prices increase with depth which coincides with those longer drill times. <br /> • Access to sites across difficult terrain and strict regulations on sedimentation during <br /> drilling can also increase prices. <br /> • Costs to maintain? <br /> • General maintenance is outside the scope of our work, but most operators will replace <br /> some of the mechanical equipment like Rumps and motors in time.Should not have to <br /> replace very frequently if properly maintained. <br /> • Mineral build-up may also require well maintenance, but this can be reduced if the well <br /> is monitored and regulated appropriately. <br />
The URL can be used to link to this page
Your browser does not support the video tag.