Orange County NC Website
24 <br /> Slide #13 <br /> Private Well vs Public Well Land Requirements <br /> • Private Wells require 50'from • Public Wells require 100' radius* <br /> septic* <br /> 0000000000 <br /> 0000000000 <br /> 0000000000 <br /> *This is an approximate.Some of the larger setbacks for Public Wells can also impact <br /> Private Wells(hazardous contamination). N <br /> AKM <br /> C.J. Cornette illustrated the land use efficiency of community wells by comparing one <br /> public well's 100-foot circle to 30 private wells' 50-foot circles at half scale. He noted one public <br /> well can serve up to 49 connections, eliminating the need for 48 individual well setback circles. <br /> Slide #14 <br /> AKMk <br /> PPsEo e[sOuucF rnruEratHi,a[ <br /> Public Supply Well Construction <br /> • Drilling Rigs N� <br /> s5{� <br /> i <br /> I <br /> I <br /> '�f <br />