Browse
Search
Minutes 11-14-2025-Work Session
OrangeCountyNC
>
Board of County Commissioners
>
Minutes - Approved
>
2020's
>
2025
>
Minutes 11-14-2025-Work Session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/22/2026 8:50:46 AM
Creation date
1/22/2026 8:45:56 AM
Metadata
Fields
Template:
BOCC
Date
11/14/2025
Meeting Type
Work Session
Document Type
Minutes
Document Relationships
1 & 2 - Orange County Land Use Plan 2050 – Board Request for Additional Information
(Attachment)
Path:
\Board of County Commissioners\BOCC Agendas\2020's\2025\Agenda - 11-14-2025 BOCC Mini-Retreat
Agenda for November 14, 2025 Mini-Retreat Meeting
(Attachment)
Path:
\Board of County Commissioners\BOCC Agendas\2020's\2025\Agenda - 11-14-2025 BOCC Mini-Retreat
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
11 <br /> Slide #13 <br /> Estimated Installation and Maintenance Costs <br /> Installation,Not Monitoring and Maintenance and <br /> System Description Including Design Testing,Annually Repairs,Annually <br /> Conventional system $9,000-$12,000 - $100-$200 <br /> °1 'o <br /> x With pump $16,000-$20,000 $300-$400 <br /> va E <br /> 70 0 <br /> a ° Innovative system $25,000-$50,000 $0-$1,000 $300-$400 <br /> � a <br /> c With Advanced Pre- <br /> Treatment $45,000 $75,000 $750-$1,500 $300 $400 <br /> Y ° Without Advanced $20,000-$40,000 $200-$300 $300-$400 <br /> c y Pre-Treatment <br /> � a <br /> o °+�' With Advanced Pre- <br /> Treatment $40,000-$60,000 $300-$500 $400-$600 <br /> Tony Whitaker said these costs are derived from his conversations with professionals in <br /> the industry. He presented installation costs ranging from $9,000-$75,000 for individual 4- <br /> bedroom homes and $20,000460,000 per lot for community systems. He emphasized the wide <br /> ranges reflect custom designs, site conditions, material choices, and contractor pricing variations. <br /> He noted potential economies of scale with community systems, though site-specific factors can <br /> counterbalance savings. Tony Whitaker noted that individual homes with advanced treatment face <br /> disproportionate testing costs compared to community systems, where costs are distributed <br /> among multiple owners. <br /> Slide #14 <br /> NC DHHS Onsite Wastewater System Types <br /> OrangeInspection Inspection <br /> System Example Frequency-By Frequency-By <br /> Classification Characteristics Management Entity Mgmt.Entity County <br /> Type Composting Toilet Owner None None <br /> x Single family with d <br /> CU a Type II conventional dispersal Owner None None Q) <br /> oSome types of non- rr <br /> u Type III conventional dispersal Owner 5 years if a pump 5 years if a pump � <br /> 00 _ <br /> r bb <br /> LPP dispersal,shared Certified Operator or Annually or Semi- 0 <br /> M Type IV 5 or 3 years <br /> C elements,etc. Public Mgmt.Entity annually IMP <br /> DSE>3000 I gpd,AP< Certified Operator or I e Type V 3000 gpd,etc. Public Mgmt.Entity Annually-Weekly Annually — <br /> Certified Operator or I <br /> LTypeVl —AP>3000gpd — Monthly-Daily —Semi-annually <br /> Public Mgmt.Entity <br /> Any Community System will be classified as Type IV,V or VI. <br />
The URL can be used to link to this page
Your browser does not support the video tag.