Browse
Search
Agenda 01-20-2026; 8-h - Ordinance Execution for Unified Development Ordinance Text Amendments – Impervious Surfaces, Watershed Protection Overlay Districts, and Stream Buffers
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2020's
>
2026
>
Agenda - 01-20-2026 Business Meeting
>
Agenda 01-20-2026; 8-h - Ordinance Execution for Unified Development Ordinance Text Amendments – Impervious Surfaces, Watershed Protection Overlay Districts, and Stream Buffers
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/15/2026 10:54:30 AM
Creation date
1/15/2026 10:56:42 AM
Metadata
Fields
Template:
BOCC
Date
1/20/2026
Meeting Type
Business
Document Type
Agenda
Agenda Item
8-h
Document Relationships
Agenda for January 20, 2026 BOCC Meeting
(Message)
Path:
\Board of County Commissioners\BOCC Agendas\2020's\2026\Agenda - 01-20-2026 Business Meeting
ORD-2026-001-Fiscal Year 2025-26 Budget Amendment #6
(Message)
Path:
\Board of County Commissioners\Ordinances\Ordinance 2020-2029\2026
ORD-2026-002-Ordinance Execution for Unified Development Ordinance Text Amendments Impervious Surfaces, Watershed Protection Overlay Districts and stream buffers
(Message)
Path:
\Board of County Commissioners\Ordinances\Ordinance 2020-2029\2026
ORD-2026-003-Revised Opioid Settlement Fund Spending Authorization Resolution and Approval of Budget Amendment #6-A
(Message)
Path:
\Board of County Commissioners\Ordinances\Ordinance 2020-2029\2026
OTHER-2026-001-Presentation of Annual Comprehensive Financial Report for FYE 6302025 and
(Message)
Path:
\Board of County Commissioners\Various Documents\2020 - 2029\2026
OTHER-2026-003-Advertisement of Tax Liens on Real Property
(Message)
Path:
\Board of County Commissioners\Various Documents\2020 - 2029\2026
PRO-2026-001-International Holocaust Remembrance Day Proclamation
(Message)
Path:
\Board of County Commissioners\Proclamations\2020-2029\2026
RES-2026-002-Property Tax Releases-Refunds
(Message)
Path:
\Board of County Commissioners\Resolutions\2020-2029\2026
RES-2026-003-Late Applications for Property Tax Exemption-Exclusion
(Message)
Path:
\Board of County Commissioners\Resolutions\2020-2029\2026
RES-2026-004-Extension of 2026 Tax Listing Period
(Message)
Path:
\Board of County Commissioners\Resolutions\2020-2029\2026
RES-2026-005-Revised Opioid Settlement Fund Spending Authorization Resolution and Approval of Budget Amendment #6-A
(Message)
Path:
\Board of County Commissioners\Resolutions\2020-2029\2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Article 6: Development Standards24 <br /> Section 6.13: Stream Buffers <br /> 6.13.2 Applicability <br /> The stream buffer regulations and standards contained herein shall be applicable to all streams <br /> and water features, as follows: <br /> (A) Streams identified by any of the following means: <br /> (1) Shown as solid blue lines or as broken blue lines on the USGS Quadrangle <br /> maps, <br /> (2) Shown as water feature in the Orange County Soil Survey, or <br /> (3) A water feature identified by a field determination of County staff trained in <br /> surface water identification through the North Carolina Division of Environmental <br /> Quality (NCDEQ). <br /> (B) StreamSteam85 buffers shall extend around the perimeter of all water features if any portion of the <br /> stream buffer of a stream touches the water feature. Disputes pertaining to water feature decisions by <br /> County staff shall be filed directly to the North Carolina Department of Environmental Quality (NCDEQ1.86 <br /> 6.13.3 Calculating Width of Stream Buffer <br /> (A) Special Flood Hazard Areas <br /> (1) Those streams identified by the Federal Emergency Management Agency <br /> JFEMAJE as having floodplains shall have stream buffers calculated from the <br /> outside edges of the 100-year floodplain. <br /> (B) Calculating Slope Value <br /> (1) Draw 250' length perpendicular lines, at 200-foot horizontal intervals along the <br /> entire length of the outside edges of the stream, or the outer edge of the FEMA <br /> floodplain, whichever is greater. <br /> (2) Determine the elevation at either the stream bank or the outer edge of the FEMA <br /> floodplain, whichever is highest (Elevation 1), and at the point 250' from the <br /> stream or FEMA floodplain, whichever is applicable, along the perpendicular line <br /> (Elevation 2). <br /> (3) Subtract Elevation 1 from Elevation 2 for the Difference. <br /> (4) Divide the Difference by 250 for the Mean. <br /> (5) Multiply the Mean by 100 to determine the "Slope Value". <br /> (6) Perform this calculation for both sides of the stream or floodplain. <br /> ss Typo fix. <br /> 86 Staff recommendation to eliminate the use of a technical acronym and improve reading clarity. <br /> 87 Staff recommendation to eliminate the use of a technical acronym and improve reading clarity. <br /> Orange County, North Carolina—Unified Development Ordinance Page 6-92 <br />
The URL can be used to link to this page
Your browser does not support the video tag.