Orange County NC Website
1 <br /> Slide #17 <br /> Ta better protect mare of the developable land <br /> (such as farmland} <br /> in the rural areas, and in the Rural Buffer,. <br /> the bounty might consider upgrading <br /> Flexible Developments with the better CSD standards, <br /> �R <br /> Replacing the Flexible Development provisions with <br /> those for Conservation Subdivision Design. <br /> Slide <br /> drawback to Flexible Development is that— <br /> in allowing developers tv count unbuildable land as <br /> part of their required minimum open space — <br /> they can satisfy much of that requirement with <br /> wetlands, steep slopes and flvadplains — <br /> thereby allowing them to locate houselots on <br /> farmland and ether resources needing protection. <br />