Orange County NC Website
30 <br /> 1 Slide #21 <br /> It Takes a Team <br /> • After completion of drilling and <br /> testing, a distribution system engineer <br /> will need to be consulted with to <br /> design distribution,which leads to.... <br /> • Utility operator review • o • V. <br /> • NC DEQ final permitting after <br /> distribution design <br /> • Contractors for construction <br /> • What does this cost?What's next? <br /> 2 AKMVL <br /> 3 <br /> 4 Slide #22 <br /> Well Drilling Costs <br /> • Expenses vary significantly per well <br /> • Drill costs influenced by: • Maintenance Costs: <br /> • Depth • Pump replacement <br /> • Surface Casing • Wellcleaning <br /> • Diameter Requirements • Water quality monitoring <br /> • Site Access <br /> 5 AF,M4► <br /> 6 <br /> 7 Slide #23 <br /> ARM'1 <br /> Long-Term Well Health <br /> • Well lifespans generally range 30-50 years, but <br /> may be extended with proper maintenance. <br /> • Well cleaning and rehabilitation <br /> • Or additional well construction <br /> 'i. <br />