Orange County NC Website
24 <br /> 1 Slide #13 <br /> Private Well vs Public Well Land Requirements <br /> • Private Wells require 50'from • Public Wells require 100' radius's <br /> septic` <br /> 0000000000 <br /> 0000000000 <br /> 0000000000 <br /> "This is an approximate.Some of the larger setbacks for Public Welts can also impact <br /> Private wells(hazardous contamination), A <br /> Z .Eo, 1. - <br /> 3 C.J. Cornette illustrated the land use efficiency of community wells by comparing one <br /> 4 public well's 100-foot circle to 30 private wells' 50-foot circles at half scale. He noted one public <br /> 5 well can serve up to 49 connections, eliminating the need for 48 individual well setback circles. <br /> 6 <br /> 7 <br /> 8 Slide #14 <br /> AKM� <br /> FpPufO PffovOCF rn•xGFxExi.Oc <br /> Public Supply Well Construction <br /> • Drilling Rigs <br /> b <br /> a <br /> J <br />