Browse
Search
2026-009-E-AMS-Utility Metering SolutionsAnimal Services Energy-Efficient Lighting upgrade
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2026
>
2026-009-E-AMS-Utility Metering SolutionsAnimal Services Energy-Efficient Lighting upgrade
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/12/2026 2:14:28 PM
Creation date
1/12/2026 2:14:14 PM
Metadata
Fields
Template:
Contract
Date
1/7/2026
Contract Starting Date
1/7/2026
Contract Ending Date
1/12/2026
Contract Document Type
Contract
Amount
$34,821.58
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Initial <br />Costs <br />Estimated <br />Rebate <br />Net <br />Project Cost <br />Electric <br />Savings <br />Material <br />Replacement <br />Savings <br />Total <br />Annual <br />Savings <br />Payback <br />In <br />Years <br />$34,822 $7,636 $27,185 $4,993 $1,327 $6,320 4.30 <br />PROJECT SUMMARY <br />UMS conducted a lighting audit of the Lighting Retrofit <br />facility. This survey and evaluation have led us to <br />recommend and propose an energy-saving lighting <br />upgrade containing the following: <br />NEW LIGHTING FIXTURES AND RETROFIT KITS <br />UMS proposes the replacement of approximately 421 <br />outdated and inefficient fixtures with state-of-the-art fixtures <br />and retrofit kits. This new system has tremendous <br />operating advantages over the existing system: It uses less <br />fixture wattage, light sources last longer, better color <br />rendering, much better color, lower replacement cost, and <br />less lumen depreciation over time, all leading to a more <br />comfortable and productive work environment. <br />TURNKEY INSTALLATION <br />UMS maintains an installation capability with no geographic <br />or project size limitations. This turnkey project will require <br />minimal involvement of Lighting Retrofit facility <br />maintenance personnel during installation. <br />Project Summary <br />XtraLight conducted a lighting audit of the Nike facility. This survey and evaluation has led us to recommend and propose an energy-saving lighting upgrade containing the following:NEW LIGHTING FIXTURES AND RETROFIT KITS <br />XtraLight proposes the replacement of approximately 119 outdated and inefficient fixtures with state-of-the-art fluorescent fixtures and retrofit kits. This new system has tremendous operating advantages over the existing system: It uses less fixture wattage, lamps last 50% longer, better color rendering, much better color, lower replacement cost, and less lumen depreciation over time, all leading to a more comfortable and productive work environment.TURNKEY INSTALLATION <br />XtraLight maintains an installation capability with no geographic or project size limitations. This turnkey project will require minimal involvement of Vetco Gray facility maintenance personnel during installation. <br />Project Summary <br />XtraLight conducted a lighting audit of the Nike facility. This survey and evaluation has led us to recommend and propose an energy-saving lighting upgrade containing the following:NEW LIGHTING FIXTURES AND RETROFIT KITS <br />XtraLight proposes the replacement of approximately 119 outdated and inefficient fixtures with state-of-the-art fluorescent fixtures and retrofit kits. This new system has tremendous operating advantages over the existing system: It uses less fixture wattage, lamps last 50% longer, better color rendering, much better color, lower replacement cost, and less lumen depreciation over time, all leading to a more comfortable and productive work environment.TURNKEY INSTALLATION <br />XtraLight maintains an installation capability with no geographic or project size limitations. This turnkey project will require minimal involvement of Vetco Gray facility maintenance personnel during installation. <br />Project Summary <br />XtraLight conducted a lighting audit of the Nike facility. This survey and evaluation has led us to recommend and propose an energy-saving lighting upgrade containing the following:NEW LIGHTING FIXTURES AND RETROFIT KITS <br />XtraLight proposes the replacement of approximately 119 outdated and inefficient fixtures with state-of-the-art fluorescent fixtures and retrofit kits. This new system has tremendous operating advantages over the existing system: It uses less fixture wattage, lamps last 50% longer, better color rendering, much better color, lower replacement cost, and less lumen depreciation over time, all leading to a more comfortable and productive work environment.TURNKEY INSTALLATION <br />XtraLight maintains an installation capability with no geographic or project size limitations. This turnkey project will require minimal involvement of Vetco Gray facility maintenance personnel during installation. <br />EXECUTIVE SUMMARY <br />OPERATING COST SAVINGS <br />Savings will be in three forms: First, a direct electric bill <br />reduction since the upgraded system burns less <br />electricity; second, a reduction in the cost of <br />replacement material because the lighting technology <br />lasts much longer and costs less to replace than the <br />existing system; and, third, reduced maintenance labor <br />expense because your employees will not have to <br />replace lamps and ballasts at the rate they do today. <br />ENVIRONMENTAL SUMMARY <br />Most companies have corporate sustainability <br />initiatives in place to reduce energy use and overall <br />carbon footprint. Engaging UMS for this lighting retrofit <br />project immediately reduces electrical consumption, <br />which also spares annual carbon dioxide (CO2) <br />emissions by 90,462 lbs, sulfur dioxide (SO2) <br />emissions by 355 lbs, and nitrogen oxide (NO2) <br />emissions by 174 lbs. This translates to an equivalent <br />of 42,272 lbs of coal burned annually to make <br />electricity, and either 11 equivalent acres of forest <br />added or 8 cars equivalent removed from the road. <br />Proprietary and Confidential—The information contained in this proposal is the sole property of Utility Metering Solutions. <br />Any reproduction in part or as a whole without the written permission of Utility Metering Solutions is prohibited. <br />Utility Metering Solutions has designed an energy-efficient lighting retrofit specifically for Lighting Retrofit in Chapel <br />Hill, NC. This project incorporates the best lighting technology in the country and is designed to improve light levels, <br />reduce energy waste and save you money. <br />The net cost of the project is $27,185 and is conservatively projected to save $6,320 per year. The project will take <br />about 6 days to install without interrupting any facility activity. The payback period for this upgrade is 4.30 years and <br />permanently lowers the operating cost of the facility. <br />Cost of Waiting <br />Waiting or postponing your lighting project will cost you $416 per month or $4,993 per year. <br />PROPRIETARY AND CONFIDENTIAL | REV. DATE: 04/12/2022 <br />Docusign Envelope ID: 1F8C46CD-1FC1-48D6-A0AD-DEE659D008C4
The URL can be used to link to this page
Your browser does not support the video tag.