Orange County NC Website
Environmental Protection and Climate Action 9 <br /> 1 .3 Solar Energy Generation <br /> 7.3 Increase the annual solar energy <br /> Solar Generated by County Facilities 4,000,000 generated at County facilities by 767016 by <br /> o June 30,2029. <br /> 3,011,619 KBTUs 3,011,619 KBTUs <br /> 3,000,000 ♦ - - - - - - - - -0 <br /> 2,217,652 KBTUs <br /> u The measure is currently on track to meet its <br /> >�F- 2,000,000 <br /> m target by June 30,2029.The County expects <br /> C: 1,127,947 KBTUs <br /> w 1,000,000 solar generation to increase due to recent and <br /> o IL L planned projects.The Efland EMS Station <br /> Ln 0 recently completed its solar installation,and <br /> Basel ine(FY23-24) FY24-25 the County has secured grant funding to install <br /> solar at the Cedar Grove Community Center. <br /> ♦• Target <br /> � Actuals <br /> The County plans to add solar to the Southern <br /> Human Services Center and the Drakeford <br /> Library Complex,and is conducting a solar <br /> feasibility study to help prioritize future <br /> projects. <br /> 1 .4 Vehicle Replacement <br /> 1.4 Replace 75916 of County non-first <br /> responder vehicles each year with Replacement Vehicles that are Electric <br /> � 100 <br /> electric or other alternative fuel vehicles <br /> (biodlesel, ethanol, hydrogen, etc.). Y 75 75% <br /> U) <br /> a� <br /> U o <br /> 50 <br /> 74%,or 23 out of 31 vehicles replaced,were j w <br /> replaced with electric vehicles in FY24-2536 of ��0 <br /> U 25 <br /> �a <br /> the 208 vehicles in the ounty fleet are electric 0 <br /> vehicles. 0 <br /> Baseline (FY23-24) FY24-25 <br /> ♦• Target <br /> + Actuals <br /> Strategic Plan Progress Report 12026 Board Retreat Page 8 <br />