Browse
Search
2025_12_09 BOER Minutes
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Board of Equalization and Review
>
Minutes
>
2025
>
2025_12_09 BOER Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/31/2025 2:28:02 PM
Creation date
12/31/2025 2:23:27 PM
Metadata
Fields
Template:
BOCC
Date
12/9/2025
Meeting Type
Regular Meeting
Document Type
Advisory Bd. Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Docusign Envelope ID: 167B6114-F2FE-40FE-B240-9F96B7861224 <br /> • These proposed changes would result in an increase in total market value from$722,874 to <br /> $817.874. <br /> • Photo of Subject <br /> • GIS Map <br /> • Sales and Equity Analysis <br /> • Current Property Record Card <br /> • Proposed Property Record Card <br /> Motion of the Board Accept Count 's Proposed Value: $817,874 <br /> Made the motion Saru Salvi <br /> Seconded the motion Richal Vanhook <br /> Voted For All BOER Members <br /> Voted Against <br /> Property Identification: <br /> Property Owner Evans Estates REI LLC Appellant(if different) <br /> Property Address Lots 3 and A,G and B Parcel ID or Abstract 9861028152 <br /> Farm Lane <br /> Statement of Appeal: Request a reduction in value based on limitations that diminish the marketability <br /> and usability of the property. <br /> Current Assessed Value $471,900 ounty Opinion $294,900 <br /> Time of Hearin 3:39PM Appellant Opinion $152,400 <br /> County Representative Jimmy Milliken Board Decision $294,900 <br /> Evidence submitted by the appellant: <br /> • Inappropriate Comparables Used in Valuation• The proposed value appears to be based on <br /> nearby subdivision developments (i.e.. Tuscany and South Creek)with completed homes <br /> starting at$600,000+. This is not an appropriate comparison for my property,which is raw, <br /> undeveloped land. •My property is located in the Rural Buffer Zoning District,while many of <br /> the comparables are in the Chapel Hill District,which has different zoning regulations, <br /> infrastructure, and desirability factors. •No adjacent or nearby properties (within 1 mile) are <br /> similarly situated all are developed with residences or income-producing improvements. <br /> Overvaluation Relative to Actual Market Value Based on research of comparable land sales <br /> within 1 mile,no similarly-sized undeveloped parcels have sold for values supporting the <br /> proposed assessment. The significant site preparation costs,regulatory hurdles, and usability <br /> restrictions severely diminish the market appeal and potential resale value of the property. <br /> • Overhead Powerlines and Easements: • A significant portion of the property is impacted by <br /> overhead powerlines, rendering approximately 1.1 acres unusable for building,animal housing, <br /> or irrigation due to safety and aesthetic concerns. •Utility easements further restrict land use, <br /> requiring me to maintain vegetation and granting utility companies access for installation and <br /> maintenance. This property has significant natural and man-made limitations that diminish its <br /> marketability and usability: Creek and Floodplain Impacts: •A creek crosses the entrance to <br /> the property, creating .8 acres of unusable land per Orange County UDO creek buffer <br /> requirements. •Crossing the creek for access requires substantial engineering: two 90-inch <br />
The URL can be used to link to this page
Your browser does not support the video tag.