Orange County NC Website
93 ■ Are there more details about what incidents have occurred for either pedestrians or bicyclists on <br /> 94 Orange High School Road or Oakdale Drive? Stantec looks at safety and crash locations, and <br /> 95 TWTPO has a vision zero safety action plan for a portion of Orange County. Stantec will provide <br /> 96 the map. <br /> 97 M Were there specific criteria beyond the goals that guided and justified the recommendations? It <br /> 98 was explained that all county roads mustfollowthe North Carolina Department of Transportation <br /> 99 (NCDOT's) Complete Streets policy, so the team reviewed the state's requirements and design <br /> 100 guidance. They used NCDOT's activity estimation map to understand areas of high walking and <br /> 101 biking demands, and evaluated speeds, traffic volumes, crash history, and existing plans to <br /> 102 shape the recommendations. <br /> 103 0 Is the pipe pad crash tool still existing? How often does it update? Yes, and it's updated <br /> 104 frequently. <br /> 105 0 How do you decide between building a 10-foot shared-use path versus two 5-foot bike lanes? <br /> 106 Since bike lanes are not separated from traffic,the shared-use path provides a much higher level <br /> 107 of protection. It's the safest option for everyday users, cautious riders, and families who don't <br /> 108 feel comfortable biking next to vehicles. Cost, along with factors like speed and traffic volumes, <br /> 109 all help determine the recommended. <br /> 110 ■ Can we have upgrades to Irwin Road? <br /> 111 E What is the difference between US 70, US 70 Business, and US 70 Alt, and why do they appear <br /> 112 differently on the map? US 70 Alt is essentially the same roadway people commonly refer to as <br /> 113 US 70 Business,while US 70 refers to the main highway alignment.The map shows both because <br /> 114 they represent two separate project areas: one on US 70 Alt/Business and another on the main <br /> 115 US 70 corridor.The team will clarify the naming in revisions to avoid confusion. <br /> 116 ■ Where can we find Appendix A?This is where all the concept designs are for each project. The <br /> 117 plan is still in draft format, and we have not assembled them;the materials are ready. <br /> 118 M How is this integrated with the town of Hillsborough?Are they also doing a similar bike plan that <br /> 119 would feed into this?This plan focuses on the unincorporated parts of Hillsborough of Orange <br /> 120 County, but Hillsborough staff participated throughout the process through stakeholder <br /> 121 meetings and the project committee. Much of the recommended network connects to <br /> 122 Hillsborough because focus groups identified more infrastructure gaps there compared to other <br /> 123 areas. While the team coordinated closely with the town, this plan does not make <br /> 124 recommendations for Hillsborough's own internal planning efforts. <br /> 125 Why did we choose the 10 projects we have designs for?Are they the top priorities, and I would <br /> 126 like to know how NC86 would fit into this?We had a list of the top 20, and 8 are from that list.We <br /> 127 did not choose the concept development; we were told which ones to move forward with. The <br /> 128 priorities are not set,yet we are getting your feedback, but these were picked as a sampling of the <br /> 129 20.Theywere informed that Nish picked these before he left, so we are having to figure out some <br /> 130 of the parts, and we are getting feedback on these ten, and we'll take that feedback into account <br /> 131 as we figure out the whole prioritization. <br /> 132 <br /> 133 <br /> 134 AGENDA ITEM 6.STAFF REPORT/UPDATES/EVENTS <br /> 135 a. Fare Free Fixed Route Service <br /> 136 This is scheduled to go before the BOCC in December 2025. Orange County is looking at going fare-free <br /> 137 on all four of our fixed route services.That would save us some staff time on getting that paperwork <br /> 138 done for customers that might or might not qualify, and then would also eliminate the collection <br /> 139 equipment that we have to replace every several years,which is expensive and takes the vehicles out of <br /> 140 service to do.We are in the process of routing a contract that will change the software that we use for <br />