Browse
Search
2025-766-E-AMS-Sasser Companies-SHSC ASI 002 Reno
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2025
>
2025-766-E-AMS-Sasser Companies-SHSC ASI 002 Reno
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/29/2025 6:10:45 PM
Creation date
12/29/2025 6:10:28 PM
Metadata
Fields
Template:
Contract
Date
12/17/2025
Contract Starting Date
12/17/2025
Contract Ending Date
12/22/2025
Contract Document Type
Contract
Amount
$19,895.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Orange County Health Department Improvements Smith Sinnett / 2024008 <br />Hillsborough, NC Orange County Asset Management Services <br /> <br />RESILIENT SHEET FLOORING 09 65 16 - 5 <br />H. Adhere floor coverings to substrates using a full spread of adhesive applied to substrate to produce a <br />completed installation without open cracks, voids, raising and puckering at joints, telegraphing of <br />adhesive spreader marks, and other surface imperfections. <br />I. Seamless Installation: <br />1. Heat-Welded Seams: Comply with ASTM F 1516. Rout joints and use welding bead to <br />permanently fuse sections into a seamless floor covering. Prepare, weld, and finish seams to <br />produce surfaces flush with adjoining floor covering surfaces. <br />2. Chemically-Bonded Seams: Bond seams with chemical-bonding compound to permanently fuse <br />sections into a seamless floor covering. Prepare seams and apply compound to produce tightly- <br />fitted seams without gaps, overlays, or excess bonding compound on floor covering surfaces. <br />J. Integral-Flash-Cove Base: Cove floor coverings [6 inches] [dimension indicated] up vertical surfaces. <br />Support floor coverings at horizontal and vertical junction by cove strip. Butt at top against cap strip. <br />1. Install metal corners at inside and outside corners. <br />3.4 CLEANING AND PROTECTION <br />A. Comply with manufacturer's written instructions for cleaning and protection of floor coverings. <br />B. Perform the following operations immediately after completing floor covering installation: <br />1. Remove adhesive and other blemishes from floor covering surfaces. <br />2. Sweep and vacuum floor coverings thoroughly. <br />3. Damp-mop floor coverings to remove marks and soil. <br />C. Protect floor coverings from mars, marks, indentations, and other damage from construction operations <br />and placement of equipment and fixtures during remainder of construction period. <br />D. Floor Polish: Remove soil, visible adhesive, and surface blemishes from floor covering before applying <br />liquid floor polish. <br />1. Apply [one] [two] [three] coat(s). <br />E. Cover floor coverings until Substantial Completion. <br />END OF SECTION 09 65 16 <br />Docusign Envelope ID: 04F3EBB0-678B-4F1A-A4C9-8379527DEA61
The URL can be used to link to this page
Your browser does not support the video tag.