Browse
Search
2025-756-E-AMS-O'Brien Atkins Associates, PA-Design Contract
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2025
>
2025-756-E-AMS-O'Brien Atkins Associates, PA-Design Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/29/2025 6:03:55 PM
Creation date
12/29/2025 6:02:23 PM
Metadata
Fields
Template:
Contract
Date
11/25/2025
Contract Starting Date
11/25/2025
Contract Ending Date
12/22/2025
Contract Document Type
Contract
Amount
$1,854,168.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
111
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4.2 TIMELINE <br />23 | <br />Because of the complexities of staffing two projects simultaneously, we will support <br />this project with two production teams: one for the Sheriff’s Office and one for <br />the Evidence Storage Facility. Project Leadership (Principal-in-Charge Kevin G. <br />Montgomery and Project Manager Tim Hillhouse) would oversee and be a coherent <br />presence for both projects. Most of the key staff proposed in this submittal will <br />perform services for both projects. <br />Ideally, the design team will be able to get the construction bid documents out <br />at the same time for both projects to provide a commodity of scale savings with <br />sub-contractors. This provides sub-contractors with the opportunity to bid on both <br />projects and would allow them to possibly sequence the construction so that once <br />one trade is finished on one project, they can proceed to the next project. <br />The team assembled for the Link Building would include Terracon’s Industrial <br />Hygienist to investigate potential environmental hazards resulting from the water <br />damage. This team would provide solutions to the water intrusion and abatement <br />concurrently while also performing visioning and programming for the facility. At the <br />same time, a team dedicated directly to the Evidence Storage Facility will be working <br />on the site layout, programming and schematic design. <br />We anticipate the site plan approval process for the Evidence Storage Facility to take <br />approximately the same amount of time as the investigation and remediation of the <br />Link Building. <br />Once complete with these activities, the Link Building team would switch to <br />demolition and remediation drawings while starting on the schematic design of <br />the new Sheriff’s Office. The Evidence Storage Team would move on to design <br />development at that point. <br />Next, the Link team would work on the design development of the Sheriff’s Office, <br />while the Evidence Storage team would begin construction documentation. <br />Once the Evidence Storage Team finishes the Construction Documents for <br />permitting, they would pivot to assisting the Link Building team in finishing the final <br />construction documents for that facility. <br />It may be possible to issue an early steel and foundation package for the Evidence <br />Storage Facility which would help bridge the time difference between the Invitation <br />for Bid (IFB) for the Evidence Storage Facility and the IFB for the Link Building. <br />This allows bids to be accepted for both projects for the MEP trades, allowing the <br />Construction Manager to schedule work in sequence. <br />Close coordination with the Construction Manager throughout the process is critical <br />in ensuring the success of these projects. <br />+ <br />Docusign Envelope ID: ED9774D9-AC0C-4CB2-997F-EA672B7B6C5D