Orange County NC Website
STANDARD HOURLY RATES <br />Classification Hourly Rate <br />Construction Administrator I $145.00 <br />Construction Administrator II $150.00 <br />Construction Administrator III $165.00 <br />Structural BIM Designer I $115.00 <br />Structural BIM Designer II $125.00 <br />Structural BIM Designer III $170.00 <br />Structural BIM Designer III/BIM <br />Leader <br />$180.00 <br />Structural Graduate Engineer $120.00 <br />Structural Project Engineer $165.00 <br />Structural Senior Project Engineer $190.00 <br />Structural Project Manager $200.00 <br />Structural Senior Project Manager $205.00 <br />Assistant Manager, Structural <br />Engineering <br />$215.00 <br />Manager, Structural Engineering $240.00 <br />Process & Quality Control Manager $205.00 <br />Expert Testimony $350.00 <br />Principal in Charge $250.00 <br />Practice Leader, Structures $270.00 <br />Student Intern, Structures $100.00 <br />REIMBURSABLE EXPENSES <br />Classification Rate <br />Plotted Base Paper $5.00/sheet <br />Plotted Base Vellum $7.50/sheet <br />Plotted Base Mylars $14.00/sheet <br />Plotter Base Paper (Colored)$10.00/sq. ft. <br />Photocopies (8 ½ x 11)$.20/sheet <br />Photocopies (11 x 17)$.40/sheet <br />Mileage $.67/mile <br />Telephone/Courier As Incurred <br />Double Sided Photocopies $.40/sheet <br />Color Copies (8 ½ x 11)$1.00/sheet <br />Color Copies (11 x 17)$3.00/sheet <br />Card Stock, color $2.25/sheet <br />Fax (Local)$.50/sheet <br />Fax (Long Distance)$.75/sheet <br />LUMP SUM RATES - STRUCTURAL ENGINEERING <br />ATTACHMENT – 2 <br />STEWART ENGINEERING, INC. <br />Structural Hourly Rates <br />(As of July 15, 2025) <br /> WWW.WEARESTEWART.COM STRENGTHENING COMMUNITIES ACROSS THE CAROLINAS <br /> <br />Attachment F <br />Docusign Envelope ID: ED9774D9-AC0C-4CB2-997F-EA672B7B6C5D