Orange County NC Website
O’Brien/Atkins Associates, PA <br />Architecture | Engineering | Landscape Architecture | Planning | Interiors <br /> <br /> <br />Post Office Box 12037 | Research Triangle Park, NC | 27709 <br />919.941.9000 | www.obrienatkins.com <br />P | 4 <br />F. We will create two (2) Renderings for use in promotional presentations. <br />G. Design team will produce As-Built drawings at the end of the project based on Contractor mark- <br />ups. <br />4. Proposed Schedule <br /> Pre-Design/Programming phase – 2 months <br /> Schematic Design – 2 months <br /> Design development – 3 months <br /> Construction documents – 5 months <br /> Bidding support - 1 month <br /> Construction Administration – 18 Months <br /> Close out – 1 month <br />Total: 33 Months <br />5. Proposed Team <br /> Project Management – O’Brien Atkins Associates <br /> Civil – Stewart Engineering <br /> Landscape - O’Brien Atkins Associates <br /> Architecture - O’Brien Atkins Associates / SLAM Collaborative <br /> Interior Design - O’Brien Atkins Associates <br /> Structural – Stewart Engineering <br /> Mechanical, Electrical, Plumbing Engineering - O’Brien Atkins Associates <br /> Telecom, Security, Audio Visual – J&A Engineering <br />6. Clarifications <br />A. Cost for Geotech and survey services are not included in this proposal <br />B. It is unknow at this time how much of the link building can be re-used. Early in Pre-Design the <br />Design team will evaluate the building for re-use. <br />C. Since we are planning on removing the envelope of the Link Building, we have removed the <br />Industrial Hygienist and the Envelope Consultants to reduce the fee. <br />D. Cost Estimating services are not provided with the assumption that this will be provided by the <br />CMAR and reviewed by the design team. If the County would like an independent cost <br />consultant we can add team to the team for an additional cost. <br />E. Fees were put together with the assumption that both projects would be developed at the same <br />time and Constructed on a similar time frame. Our schedule assumed an 18 month construction <br />schedule. If the construction phase goes beyond the allotted time we could ask for an additional <br />service if needed. <br />Docusign Envelope ID: ED9774D9-AC0C-4CB2-997F-EA672B7B6C5D