Browse
Search
2025-756-E-AMS-O'Brien Atkins Associates, PA-Design Contract
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2025
>
2025-756-E-AMS-O'Brien Atkins Associates, PA-Design Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/29/2025 6:03:55 PM
Creation date
12/29/2025 6:02:23 PM
Metadata
Fields
Template:
Contract
Date
11/25/2025
Contract Starting Date
11/25/2025
Contract Ending Date
12/22/2025
Contract Document Type
Contract
Amount
$1,854,168.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
111
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
22 <br />Revised 01/24 <br /> <br /> DEFINITIONS <br /> Item on Form Definition <br /> CURRENT ESTIMATED <br />CONSTRUCTION COST <br />Attach basis and justification for estimate. Include description, <br />quantities, units, special features, similar cost on recent projects, etc. <br /> <br />A. 1. Demolition <br /> <br />Includes but may not be limited to lead or asbestos testing and <br />removal, building or interior space demolition in whole or part. <br /> <br />A. 2. Site Work <br /> <br />Includes but may not be limited to grading, excavating, poor soils or <br />rock removal, utilities relocation, roads, walks, parking, streambank <br />repairs, stormwater management, retaining walls, rainwater harvesting <br />systems, landscaping. <br /> <br />B. 1. Utility Services <br /> <br />Attach explanation of any special building, mechanical, or electrical <br />service requirements with appropriate distance to existing buildings, <br />water, gas, electrical or other utility service. <br /> <br />B. 9. Associated Construction <br />Costs <br /> <br />Includes but may not be limited to construction fire alarm testing, <br />utility shut downs, utilities, signage, security, displaced parking, <br />staging, lock cores, keys, permits. <br /> <br />B. 10. Other <br /> <br />List other signficant sources of cost not included elsewhere. <br />Additional lines may be added if needed. <br /> <br />PRECONSTRUCTION <br />COSTS <br /> <br />Includes but may not be limited to land surveys, lead/asbestos <br />surveys, environmental assessments, copying, postage, costs of print <br />advertising, and destructive testing. For CM at Risk, preconstruction <br />costs are consistent with the requirements of the preconstruction <br />services agreement. <br /> <br />CONTINGENCIES <br /> <br />Unanticipated or unforseen conditions including but not limited to <br />design error and omissions, concealed site conditions, utility conflicts, <br />and extended overhead resulting from weather or other delay. <br /> <br />Docusign Envelope ID: ED9774D9-AC0C-4CB2-997F-EA672B7B6C5D
The URL can be used to link to this page
Your browser does not support the video tag.