Browse
Search
2025-756-E-AMS-O'Brien Atkins Associates, PA-Design Contract
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2025
>
2025-756-E-AMS-O'Brien Atkins Associates, PA-Design Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/29/2025 6:03:55 PM
Creation date
12/29/2025 6:02:23 PM
Metadata
Fields
Template:
Contract
Date
11/25/2025
Contract Starting Date
11/25/2025
Contract Ending Date
12/22/2025
Contract Document Type
Contract
Amount
$1,854,168.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
111
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
20 <br />Revised 01/24 <br />Attachment C - Format of Total Project Cost Estimate <br /> <br />ORANGE COUNTY Attachment C--- Project Cost Estimate <br /> PROJECT <br />IDENTIFICATION: <br />PROJECT CITY or <br />LOCATION: <br /> (Definitions/explanations are provided on pg 2 to assist in <br />completion of this form.) CURRENT ESTIMATED <br />CONSTRUCTION COSTS QTY UNIT <br />COST PER <br />UNIT TOTAL <br /> <br />A. Site Preparation <br /> 1. Demolition $0 <br /> 2. Site Work $0 <br />B. Construction <br /> 1. Utility Services $0 <br /> 2. Building Construction (new space) $0 <br /> 3. Building Construction (existing) $0 <br /> 4. Plumbing (new space) $0 <br /> 5. HVAC (new space) $0 <br /> 6. Electrical (Includes TV & Radio Studio) $0 <br /> 7. Fire Supression and Alarm Systems $0 <br /> 8. Telephone, Data, Video $0 <br /> 9. Associated Construction Costs $0 <br /> 10. Other: $0 <br />C. Equipment <br /> 1. Fixed $0 <br /> 2. Moveable $0 <br />ESTIMATED CONSTRUCTION COSTS $0 <br />Items below may be calculated by percentage or lump sum. If using lump <br />sum, make entry in $ field. <br /> DESIGN FEE % (% of Estimated Construction Costs) $0 <br />PRECONSTRUCTION <br />COSTS % (% of Estimated Construction Costs) $0 <br />CONTINGENCIES % (% of Estimated Construction Costs) $0 <br />ESTIMATED COSTS (% of Estimated Construction Costs + Contingencies + Design Fee) $0 <br />Escalation = percent per month multiplied by number of months (From Est. Date to mid-point of construction) = months % per month <br />ESCALATION COST INCREASE (Total of Estimated Costs x Escalation %) $0 <br />ESTIMATED TOTAL PROJECT COSTS (Estimated Costs + Escalation Cost Increase if any) $0 <br />Docusign Envelope ID: ED9774D9-AC0C-4CB2-997F-EA672B7B6C5D
The URL can be used to link to this page
Your browser does not support the video tag.