Browse
Search
2025-755-E-AMS-Sasser Companies-SHSC ASI 001 Reno
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2025
>
2025-755-E-AMS-Sasser Companies-SHSC ASI 001 Reno
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/29/2025 6:01:26 PM
Creation date
12/29/2025 6:00:04 PM
Metadata
Fields
Template:
Contract
Date
12/1/2025
Contract Starting Date
12/1/2025
Contract Ending Date
12/22/2025
Contract Document Type
Contract
Amount
$28,900.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
121
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Orange County Health Department Improvements Smith Sinnett / 2024008 <br />Hillsborough, NC Orange County Asset Management Services <br />ACOUSTICAL TILE CEILINGS 09 51 23 - 6 <br />B. Suspend ceiling hangers from building’s structural members and as follows: <br />1. Install hangers plumb and free from contact with insulation or other objects within ceiling plenum that are <br />not part of supporting structure or of ceiling suspension system. <br />2. Splay hangers only where required to miss obstructions; offset resulting horizontal forces by bracing, <br />countersplaying, or other equally effective means. <br />3. Splay hangers only where required and, if permitted with fire-resistance-rated ceilings, to miss obstructions; <br />offset resulting horizontal forces by bracing, countersplaying, or other equally effective means. <br />4. Where width of ducts and other construction within ceiling plenum produces hanger spacings that interfere <br />with location of hangers at spacings required to support standard suspension system members, install <br />supplemental suspension members and hangers in form of trapezes or equivalent devices. <br />5. Secure wire hangers to ceiling suspension members and to supports above with a minimum of three tight <br />turns. Connect hangers directly either to structures or to inserts, eye screws, or other devices that are secure <br />and appropriate for substrate and that will not deteriorate or otherwise fail due to age, corrosion, or elevated <br />temperatures. <br />6. Do not support ceilings directly from permanent metal forms or floor deck. Fasten hangers to cast-in-place <br />hanger inserts, postinstalled mechanical or adhesive anchors, or power-actuated fasteners that extend <br />through forms into concrete. <br />7. When steel framing does not permit installation of hanger wires at spacing required, install carrying <br />channels or other supplemental support for attachment of hanger wires. <br />8. Do not attach hangers to steel deck tabs. <br />9. Do not attach hangers to steel roof deck. Attach hangers to structural members. <br />10. Space hangers not more than 48 inches o.c. along each member supported directly from hangers, unless <br />otherwise indicated; provide hangers not more than 8 inches from ends of each member. <br />11. Size supplemental suspension members and hangers to support ceiling loads within performance limits <br />established by referenced standards and publications. <br />C. Secure bracing wires to ceiling suspension members and to supports with a minimum of four tight turns. Suspend <br />bracing from building’s structural members as required for hangers, without attaching to permanent metal forms, <br />steel deck, or steel deck tabs. Fasten bracing wires into concrete with cast-in-place or postinstalled anchors. <br />D. Install edge moldings and trim of type indicated at perimeter of acoustical tile ceiling area and where necessary to <br />conceal edges of acoustical tiles. <br />1. Apply acoustical sealant in a continuous ribbon concealed on back of vertical legs of moldings before they <br />are installed. <br />2. Screw attach moldings to substrate at intervals not more than 16 inches o.c. and not more than 3 inches from <br />ends, leveling with ceiling suspension system to a tolerance of 1/8 inch in 12 feet. Miter corners accurately <br />and connect securely. <br />3. Do not use exposed fasteners, including pop rivets, on moldings and trim. <br />E. Install suspension system runners so they are square and securely interlocked with one another. Remove and <br />replace dented, bent, or kinked members. <br />F. Arrange directionally patterned acoustical tiles as follows: <br />1. Install tiles with pattern running in one direction parallel to long axis of space. <br />3.4 CLEANING <br />A. Clean exposed surfaces of acoustical tile ceilings, including trim and edge moldings. Comply with manufacturer’s <br />written instructions for cleaning and touchup of minor finish damage. Remove and replace tiles and other ceiling <br />components that cannot be successfully cleaned and repaired to permanently eliminate evidence of damage. <br />END OF SECTION 09 51 23 <br />Docusign Envelope ID: 2D852F9B-A7CF-462A-9536-444A53AA848A
The URL can be used to link to this page
Your browser does not support the video tag.