Browse
Search
2025-755-E-AMS-Sasser Companies-SHSC ASI 001 Reno
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2025
>
2025-755-E-AMS-Sasser Companies-SHSC ASI 001 Reno
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/29/2025 6:01:26 PM
Creation date
12/29/2025 6:00:04 PM
Metadata
Fields
Template:
Contract
Date
12/1/2025
Contract Starting Date
12/1/2025
Contract Ending Date
12/22/2025
Contract Document Type
Contract
Amount
$28,900.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
121
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Orange County Health Department Improvements Smith Sinnett /2024008 <br />Hillsborough,NC Orange County Asset Management Services <br />WIRING DEVICES 26 27 26 - 3 <br />5.Source Limitations: Where wall controls are furnished as part of lighting control system,provide <br />accessory matching receptacles and wallplates by the same manufacturer in locations indicated. <br />B Receptacles -General Requirements: Self-grounding,complying with NEMA WD 1 and NEMA WD 6,and <br />listed as complying with UL 498and where applicable FS W-C-596;types as indicated on the drawings. <br />1.Wiring Provisions: Terminal screws for side wiring or screw actuated binding clamp for back wiring <br />with separate ground terminal screw. <br />2.NEMA configurations specified are according to NEMA WD 6. <br />C Convenience Receptacles: <br />1.Standard Convenience Receptacles: Tamper Resistant Industrial Heavy Duty Grade,20A,125V, <br />NEMA 5-20R;single or duplex as indicatedon the drawings. <br />D GFCI Receptacles: <br />1.GFCI Receptacles -General Requirements: Tamper Resistant Self-testing,with feed-through <br />protection and light to indicate ground fault tripped condition and loss of protection;listed as <br />complying with UL 943,class A. <br />a.Provide test and reset buttons of same color as device. <br />2.Standard GFCI Receptacles: Extra Heavy Duty Grade,duplex,20A,125V,NEMA 5-20R,rectangular <br />decorator style. <br />3.Weather Resistant GFCI Receptacles: Tamper Resistant Commercial specification grade,duplex,20A, <br />125V,NEMA 5-20R,rectangular decorator style,listed and labeled as weather resistant type <br />complying with UL 498 Supplement SE suitable for installation in damp or wet locations. <br />2.06 WALL PLATES <br />A Manufacturers: <br />1.Hubbell Incorporated. <br />2.Leviton Manufacturing Company,Inc. <br />3.Pass &Seymour,a brand of Legrand North America,Inc. <br />4.Source Limitations: Where wall controls are furnished as part of lighting control system,provide <br />accessory matching receptacles and wallplates by the same manufacturer in locations indicated. <br />B Wall Plates: Comply with UL 514D. <br />1.Configuration: One piece cover as required for quantity and types of corresponding wiring devices. <br />2.Size: Semi-Jumbo;Midi Size. <br />3.Screws: Metal with slotted heads finished to match wall plate finish. <br />C Stainless Steel Wall Plates: Brushed satin finish,Type 302 stainless steel. <br />D Galvanized Steel Wall Plates: Rounded corners and edges,with corrosion resistant screws. <br />E Weatherproof Covers for Wet and Damp Locations: Gasketed,thermoplastic,with self-closing hinged cover <br />and corrosion-resistant screws;listed as suitable for use in wet locations with cover closed.Covers must be <br />weatherproof while in use. <br />PART 3 EXECUTION <br />3.01 EXAMINATION <br />A Verify that field measurements are as indicated. <br />B Verify that outlet boxes are installed in proper locations and at proper mounting heights and are properly <br />sized to accommodate devices and conductors in accordance with NFPA 70. <br />C Verify that wall openings are neatly cut and will be completely covered by wall plates. <br />D Verify that final surface finishes are complete,including painting. <br />E Verify that branch circuit wiring installation is completed,tested,and ready for connection to wiring devices. <br />F Verify that conditions are satisfactory for installation prior to starting work. <br />3.02 PREPARATION <br />A Provide extension rings to bring outlet boxes flush with finished surface. <br />B Clean dirt,debris,plaster,and other foreign materials from outlet boxes. <br />Docusign Envelope ID: 2D852F9B-A7CF-462A-9536-444A53AA848A
The URL can be used to link to this page
Your browser does not support the video tag.