Browse
Search
2025-728-E-AMS-Brady Trane Services-HBOC EV Charging Stations
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2025
>
2025-728-E-AMS-Brady Trane Services-HBOC EV Charging Stations
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2025 1:25:22 PM
Creation date
12/11/2025 1:25:13 PM
Metadata
Fields
Template:
Contract
Date
12/1/2025
Contract Starting Date
12/1/2025
Contract Ending Date
12/8/2025
Contract Document Type
Contract
Amount
$195,000.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PLANET <br />FITNESS <br />ORANGE <br />COUNTY SOCIAL <br />SERVICES <br />ENO RIVER <br />DENTAL <br />SUBWAY <br />MI PUEBLO <br />TOKYO <br />EXPRESS <br />IQ JUI-JITSU <br />HILLSBOROUGH MAYOST.SITE PLAN <br />SCALE: NOT TO SCALE NPARTIAL POWER PLAN <br />SCALE: 1/8" = 1'-0" <br />KEYED NOTES TO POWER PLAN <br />EV CHARGER TO BE INSTALLED IN FUTURE PHASE. ROUGH-IN CONDUIT UP THROUGH CONCRETE BASE AND <br />TERMINATE 2" ABOVE CONCRETE BASE. INSTALL PULL-STRING AND CAP CONDUIT. <br />PANELBOARD & METER ON SUPPORT FRAME. REFER TO STAND DETAIL. <br />1 <br />2 <br />PNL-A,CKTS 5,7 <br />PNL-A,CKTS 1,3 <br />PNL-A,CKTS 13,15 <br />PNL-A,CKTS 9,11 <br />PNL-A,CKTS 21,23 <br />PNL-A,CKTS 17,19 <br />PNL-A,CKTS 6,8 <br />PNL-A,CKTS 2,4 <br />PNL-A,CKTS 14,16 <br />PNL-A,CKTS 10,12 <br />(FUTURE) <br />(FUTURE)1 <br />(FUTURE)(FUTURE) <br />PNL-A,CKTS 18,20PNL-A,CKTS 22,24 1 <br />POWERCHARGE COMMERCIAL ENERGY SERIES <br />40A,208 VAC/1Ø DUAL PEDESTAL MOUNT CHARGER W/ <br />CELLULAR CONTROL. (TYP.4) <br />CUT EXISTING CONCRETE CURB AND ASPHALT AS <br />REQUIRED. POUR NEW CONCRETE BASE. REFER TO <br />CHARGER BASE DETAIL. (TYP.4) <br />NEW BOLLARDS SEE BOLLARD DETAIL. (TYP.8) <br />UTILITY TRANSFORMER. <br />BY UTILITY COMPANY. <br />COORDINATE FINAL LOCATION. <br />GFI <br />WP <br />SELF-CONTAINED METER <br />PNL-A <br />PNL-A,CKT 25 <br />2 <br />FUTURE BOLLARD LOCATIONS. (TYP.)ELECTRICAL DESIGN FOR:PARTIAL POWER PLAN <br />E2.1 <br />Project <br />Name <br />Rev. #Date <br />Date 08-05-2025 <br />Drawn by LHP <br />Checked By STP <br />Scale <br />Project <br />Number <br />Sheet Name <br />Revision/Issue <br />Sheet Number <br />AS NOTED ON PLANSHILLSBOROUGH COMMONSCHARGERSHILLSBOROUGH 113 MAYO STREET, HILLSBOROUGH NC210 N. MAIN ST. SUITE 340 <br />KERNERSVILLE, NC <br />LC# P-0504 <br />AE20250617 <br />Docusign Envelope ID: 0F194B0D-BE2E-41E2-82AB-106860594B84
The URL can be used to link to this page
Your browser does not support the video tag.