Orange County NC Website
FORM OF PROPOSAL <br /> <br />Attendant Booth Additions TRC PN: 670493 <br />Orange County, North Carolina AUGUST 2025 <br />BF-2 <br /> <br />Total Base Bid Price: <br /> <br /> Dollars($) <br />(In Words) <br /> <br /> <br /> <br />Unit Cost Schedule <br /> <br />Bidder Provides the following unit costs as a means of determining the value of Work added to or deleted <br />from the Contract: <br /> <br /> <br />Unit Rate Schedule <br />Item <br />No. Description Unit Unit Cost <br />1. Excavation CY $___________/CY <br />2. Structural Fill CY $___________/CY <br />3. Asphalt Paving SY $___________/SY <br />4. Aggregate Base Course SY $___________/SY <br /> <br /> <br />UNIT COST SCHEDULE MEASUREMENT AND BASIS FOR PAYMENT <br /> <br />The line items below provide further description of the items included in the unit cost schedule and shall be <br />used as a means of determining the value of Work added to or deleted from the Contract. The Unit Cost <br />Schedule generally outlines each item and the corresponding unit price listed by the Contractor. The price <br />associated with each item shall be the full compensation paid for the Work described, regardless of the <br />items. <br /> <br />No payment for unit cost items shall be made without prior approval of Owner. <br /> <br />The Contractor shall provide quantity justification with pay requests for items paid on a unit rate basis. <br />Quantities for unit price bid items shall be calculated based on the measurement. The Engineer reserves the <br />right to make final decision regarding those quantities. <br /> <br />UNIT COST ITEMS: <br /> <br />1. MOBILIZATION - This work shall consist of furnishing all necessary insurance, coinsurance, <br />reinsurance, payment/performance bonds, local permits (including payment of permit fees), <br />mobilization of equipment, forces, and personnel for the project. Work shall also consist of <br />furnishing all necessary demobilization of equipment, forces, and personnel for the project. This <br />line item shall be a maximum of 3% of the base bid price. Payment for this line item will be made <br />under a one-time charge and will constitute full compensation for all labor, equipment, tools, <br />and other items necessary and incidental to the completion of this work. <br />Docusign Envelope ID: 34F94CE0-2CE8-49C5-B7C4-6B696F8E23C3