Orange County NC Website
C:\USERS\JCATLIN\DC\ACCDOCS\TRC\OCSW ATTENDANT BOOTH\PROJECT FILES\03-SDI\CAD\670493 - OSCW ATTENDANT BOOTH\670493-NOTE.DWG - 8/28/25SHEETDESIGN BY:DRAWN BY:CHECKED BY:SCALE:JOB NUMBER:TRC ENGINEERS, INC.114 EDINBURGH SOUTH DRIVE, SUITE 200 CARY, NC 27511(919) 827 - 0864NC FIRM LICENSE #F-0591NO.REVISIONDATEORANGE COUNTY SOLID WASTE -ATTENDANT BOOTH ADDITIONSORANGE COUNTY, NORTH CAROLINAAUGUST, 2025 670493NJWALDIUSORANGE COUNTY SOLID WASTEPART II, SECTION G, ITEM (4) <br />DRAW DOWN OF SEDIMENT BASINS FOR MAINTENANCE OR CLOSE OUT <br />SEDIMENT BASINS AND TRAPS THAT RECEIVE RUNOFF FROM DRAINAGE AREAS OF ONE ACRE OR MORE SHALL USE OUTLET <br />STRUCTURES THAT WITHDRAW WATER FROM THE SURFACE WHEN THESE DEVICES NEED TO BE DRAWN DOWN FOR <br />MAINTENANCE OR CLOSE OUT UNLESS THIS IS INFEASIBLE. THE CIRCUMSTANCES IN WHICH IT IS NOT FEASIBLE TO <br />WITHDRAW WATER FROM THE SURFACE SHALL BE RARE (FOR EXAMPLE, TIMES WITH EXTENDED COLD WEATHER). <br />NON-SURFACE WITHDRAWALS FROM SEDIMENT BASINS SHALL BE ALLOWED ONLY WHEN ALL OF THE FOLLOWING <br />CRITERIA HAVE BEEN MET: <br />(A) THE E&SC PLAN AUTHORITY HAS BEEN PROVIDED WITH DOCUMENTATION OF THE NON-SURFACE WITHDRAWAL <br />AND THE SPECIFIC TIME PERIODS OR CONDITIONS IN WHICH IT WILL OCCUR. THE NON-SURFACE WITHDRAWAL <br />SHALL NOT COMMENCE UNTIL THE E&SC PLAN AUTHORITY HAS APPROVED THESE ITEMS, <br />(B) THE NON-SURFACE WITHDRAWAL HAS BEEN REPORTED AS AN ANTICIPATED BYPASS IN ACCORDANCE WITH PART III, <br />SECTION C, ITEM (2)(C) AND (D) OF THIS PERMIT, <br />(C) DEWATERING DISCHARGES ARE TREATED WITH CONTROLS TO MINIMIZE DISCHARGES OF POLLUTANTS FROM <br />STORMWATER THAT IS REMOVED FROM THE SEDIMENT BASIN. EXAMPLES OF APPROPRIATE CONTROLS INCLUDE <br />PROPERLY SITED, DESIGNED AND MAINTAINED DEWATERING TANKS, WEIR TANKS, AND FILTRATION SYSTEMS, <br />(D) VEGETATED, UPLAND AREAS OF THE SITES OR A PROPERLY DESIGNED STONE PAD IS USED TO THE EXTENT FEASIBLE <br />AT THE OUTLET OF THE DEWATERING TREATMENT DEVICES DESCRIBED IN ITEM (C) ABOVE, <br />(E) VELOCITY DISSIPATION DEVICES SUCH AS CHECK DAMS, SEDIMENT TRAPS, AND RIPRAP ARE PROVIDED AT THE <br />DISCHARGE POINTS OF ALL DEWATERING DEVICES, AND <br />(F) SEDIMENT REMOVED FROM THE DEWATERING TREATMENT DEVICES DESCRIBED IN ITEM (C) ABOVE IS DISPOSED OF <br />IN A MANNER THAT DOES NOT CAUSE DEPOSITION OF SEDIMENT INTO WATERS OF THE UNITED STATES. <br />POLYACRYLAMIDES (PAMS) AND FLOCCULANTS <br />01.SELECT FLOCCULANTS THAT ARE APPROPRIATE FOR THE SOILS BEING EXPOSED DURING CONSTRUCTION, SELECTING <br />FROM THE NC DWR LIST OF APPROVED PAMS/FLOCCULANTS. <br />02.APPLY FLOCCULANTS AT OR BEFORE THE INLETS TO EROSION AND SEDIMENT CONTROL MEASURES. <br />03.APPLY FLOCCULANTS AT THE CONCENTRATIONS SPECIFIED IN THE NC DWR LIST OF APPROVED PAMS/FLOCCULANTS <br />AND IN ACCORDANCE WITH THE MANUFACTURER'S INSTRUCTIONS. <br />04.PROVIDE PONDING AREA FOR CONTAINMENT OF TREATED STORMWATER BEFORE DISCHARGING OFFSITE. <br />05.STORE FLOCCULANTS IN LEAK-PROOF CONTAINERS THAT ARE KEPT UNDER STORM-RESISTANT COVER OR <br />SURROUNDED BY SECONDARY CONTAINMENT STRUCTURES. <br />HAZARDOUS AND TOXIC WASTE <br />01.CREATE DESIGNATED HAZARDOUS WASTE COLLECTION AREAS ON-SITE. <br />02.PLACE HAZARDOUS WASTE CONTAINERS UNDER COVER OR IN SECONDARY CONTAINMENT. <br />03.DO NOT STORE HAZARDOUS CHEMICALS, DRUMS OR BAGGED MATERIALS DIRECTLY ON THE GROUND. <br />EQUIPMENT AND VEHICLE MAINTENANCE <br />01.MAINTAIN VEHICLES AND EQUIPMENT TO PREVENT DISCHARGE OF FLUIDS. <br />02.PROVIDE DRIP PANS UNDER ANY STORED EQUIPMENT. <br />03.IDENTIFY LEAKS AND REPAIR AS SOON AS FEASIBLE, OR REMOVE LEAKING EQUIPMENT FROM THE PROJECT. <br />04.COLLECT ALL SPENT FLUIDS, STORE IN SEPARATE CONTAINERS AND PROPERLY DISPOSE AS HAZARDOUS WASTE <br />(RECYCLE WHEN POSSIBLE). <br />05.REMOVE LEAKING VEHICLES AND CONSTRUCTION EQUIPMENT FROM SERVICE UNTIL THE PROBLEM HAS BEEN <br />CORRECTED. <br />06.BRING USED FUELS, LUBRICANTS, COOLANTS, HYDRAULIC FLUIDS AND OTHER PETROLEUM PRODUCTS TO A <br />RECYCLING OR DISPOSAL CENTER THAT HANDLES THESE MATERIALS. <br />LITTER, BUILDING MATERIAL AND LAND CLEARING WASTE <br />01.NEVER BURY OR BURN WASTE. PLACE LITTER AND DEBRIS IN APPROVED WASTE CONTAINERS. <br />02.PROVIDE A SUFFICIENT NUMBER AND SIZE OF WASTE CONTAINERS (E.G DUMPSTER, TRASH RECEPTACLE) ON SITE <br />TO CONTAIN CONSTRUCTION AND DOMESTIC WASTES. <br />03.LOCATE WASTE CONTAINERS AT LEAST 50 FEET AWAY FROM STORM DRAIN INLETS AND SURFACE WATERS UNLESS <br />NO OTHER ALTERNATIVES ARE REASONABLY AVAILABLE. <br />04.LOCATE WASTE CONTAINERS ON AREAS THAT DO NOT RECEIVE SUBSTANTIAL AMOUNTS OF RUNOFF FROM UPLAND <br />AREAS AND DOES NOT DRAIN DIRECTLY TO A STORM DRAIN, STREAM OR WETLAND. <br />05.COVER WASTE CONTAINERS AT THE END OF EACH WORKDAY AND BEFORE STORM EVENTS OR PROVIDE SECONDARY <br />CONTAINMENT. REPAIR OR REPLACE DAMAGED WASTE CONTAINERS. <br />06.ANCHOR ALL LIGHTWEIGHT ITEMS IN WASTE CONTAINERS DURING TIMES OF HIGH WINDS. <br />07.EMPTY WASTE CONTAINERS AS NEEDED TO PREVENT OVERFLOW. CLEAN UP IMMEDIATELY IF CONTAINERS <br />OVERFLOW. <br />08.DISPOSE WASTE OFF-SITE AT AN APPROVED DISPOSAL FACILITY. <br />09.ON BUSINESS DAYS, CLEAN UP AND DISPOSE OF WASTE IN DESIGNATED WASTE CONTAINERS. <br />PART III <br />SELF-INSPECTION, RECORDKEEPING AND REPORTING <br />SECTION A: SELF-INSPECTION <br />SELF-INSPECTIONS ARE REQUIRED DURING NORMAL BUSINESS HOURS IN ACCORDANCE WITH THE TABLE BELOW. WHEN <br />ADVERSE WEATHER OR SITE CONDITIONS WOULD CAUSE THE SAFETY OF THE INSPECTION PERSONNEL TO BE IN JEOPARDY, <br />THE INSPECTION MAY BE DELAYED UNTIL THE NEXT BUSINESS DAY ON WHICH IT IS SAFE TO PERFORM THE INSPECTION. IN <br />ADDITION, WHEN A STORM EVENT OF EQUAL TO OR GREATER THAN 1.0"OCCURS OUTSIDE OF NORMAL BUSINESS HOURS, <br />THE SELF-INSPECTION SHALL BE PERFORMED UPON THE COMMENCEMENT OF THE NEXT BUSINESS DAY. ANY TIME WHEN <br />INSPECTIONS WERE DELAYED SHALL BE NOTED IN THE INSPECTION RECORD. <br />NOTE: THE RAIN INSPECTION RESETS THE REQUIRED 7 CALENDAR DAY INSPECTION REQUIREMENT. <br />PART III <br />SELF-INSPECTION, RECORDKEEPING AND REPORTING <br />SECTION B: RECORDKEEPING <br />01. E&SC PLAN DOCUMENTATION <br />THE APPROVED E&SC PLAN AS WELL AS ANY APPROVED DEVIATION SHALL BE KEPT ON THE SITE. THE APPROVED E&SC PLAN <br />MUST BE KEPT UP-TO-DATE THROUGHOUT THE COVERAGE UNDER THIS PERMIT. THE FOLLOWING ITEMS PERTAINING TO THE <br />E&SC PLAN SHALL BE KEPT ON SITE AND AVAILABLE FOR INSPECTION AT ALL TIMES DURING NORMAL BUSINESS HOURS. <br />02. DOCUMENTATION TO BE RETAINED FOR THREE YEARS. <br />ALL DATA USED TO COMPLETE THE E-NOI AND ALL INSPECTION RECORDS SHALL BE <br />MAINTAINED FOR A PERIOD OF THREE YEARS AFTER PROJECT COMPLETION AND MADE <br />AVAILABLE UPON REQUEST. [40 CFR 122.41] <br />03. ADDITIONAL DOCUMENTATION TO BE KEPT ON SITE <br />IN ADDITION TO THE E&SC PLAN DOCUMENTS ABOVE, THE FOLLOWING ITEMS SHALL <br />BE KEPT ON THE SITE AND AVAILABLE FOR INSPECTORS AT ALL TIMES DURING <br />NORMAL BUSINESS HOURS, UNLESS THE DIVISION PROVIDES A SITE-SPECIFIC <br />EXEMPTION BASED ON UNIQUE SITE CONDITIONS THAT MAKE THIS REQUIREMENT <br />NOT PRACTICAL: <br />(a)THIS GENERAL PERMIT AS WELL AS THE CERTIFICATE OF COVERAGE, AFTER IT IS <br />RECEIVED. <br />(b)RECORDS OF INSPECTIONS MADE DURING THE PREVIOUS TWELVE MONTHS. THE <br />PERMITTEE SHALL RECORD THE REQUIRED OBSERVATIONS ON THE INSPECTION <br />RECORD FORM PROVIDED BY THE DIVISION OR A SIMILAR INSPECTION FORM THAT <br />INCLUDES ALL THE REQUIRED ELEMENTS. USE OF ELECTRONICALLY-AVAILABLE <br />RECORDS IN LIEU OF THE REQUIRED PAPER COPIES WILL BE ALLOWED IF SHOWN TO <br />PROVIDE EQUAL ACCESS AND UTILITY AS THE HARD-COPY RECORDS. <br />ITEM TO DOCUMENT DOCUMENTATION REQUIREMENTS <br />(A) EACH E&SC MEASURE HAS BEEN <br />INSTALLED AND DOES NOT SIGNIFICANTLY <br />DEVIATE FROM THE LOCATIONS, <br />DIMENSIONS AND RELATIVE ELEVATIONS <br />SHOWN ON THE APPROVED E&SC PLAN. <br />INITIAL AND DATE EACH E&SC MEASURE ON A COPY OF THE APPROVED E&SC <br />PLAN OR COMPLETE, DATE AND SIGN AN INSPECTION REPORT THAT LISTS <br />EACH E&SC MEASURE SHOWN ON THE APPROVED E&SC PLAN. THIS <br />DOCUMENTATION IS REQUIRED UPON THE INITIAL INSTALLATION OF THE E&SC <br />MEASURES OR IF THE E&SC MEASURES ARE MODIFIED AFTER INITIAL <br />INSTALLATION. <br />(B) A PHASE OF GRADING HAS BEEN <br />COMPLETED. <br />INITIAL AND DATE A COPY OF THE APPROVED E&SC PLAN OR COMPLETE, <br />DATE AND SIGN AN INSPECTION REPORT TO INDICATE COMPLETION OF THE <br />CONSTRUCTION PHASE. <br />(C) GROUND COVER IS LOCATED AND <br />INSTALLED IN ACCORDANCE WITH THE <br />APPROVED E&SC PLAN. <br />INITIAL AND DATE A COPY OF THE APPROVED E&SC PLAN OR COMPLETE, <br />DATE AND SIGN AN INSPECTION REPORT TO INDICATE COMPLIANCE WITH <br />APPROVED GROUND COVER SPECIFICATIONS. <br />(D) THE MAINTENANCE AND REPAIR <br />REQUIREMENTS FOR ALL E&SC MEASURES <br />HAVE BEEN PERFORMED. <br />COMPLETE, DATE AND SIGN AN INSPECTION REPORT. <br />(E) CORRECTIVE ACTIONS HAVE BEEN <br />TAKEN TO E&SC MEASURES. <br />INITIAL AND DATE A COPY OF THE APPROVED E&SC PLAN OR COMPLETE, <br />DATE AND SIGN AN INSPECTION REPORT TO INDICATE THE COMPLETION OF <br />THE CORRECTIVE ACTION. <br />INSPECT <br />FREQUENCY (DURING <br />NORMAL BUSINESS <br />HOURS) <br />INSPECTION RECORDS MUST INCLUDE: <br />(1) RAIN GAUGE <br />MAINTAINED IN GOOD <br />WORKING ORDER <br />DAILY <br />DAILY RAINFALL AMOUNTS. <br />IF NO DAILY RAIN GAUGE OBSERVATIONS ARE MADE DURING WEEKEND <br />OR HOLIDAY PERIODS, AND NO INDIVIDUAL-DAY RAINFALL INFORMATION <br />IS AVAILABLE, RECORD THE CUMULATIVE RAIN MEASUREMENT FOR <br />THOSE UN-ATTENDED DAYS (AND THIS WILL DETERMINE IF A SITE <br />INSPECTION IS NEEDED). DAYS ON WHICH NO RAINFALL OCCURRED <br />SHALL BE RECORDED AS “ZERO”. THE PERMITTEE MAY USE ANOTHER <br />RAIN-MONITORING DEVICE APPROVED BY THE DIVISION. <br />(2) E&SC MEASURES <br />AT LEAST ONCE PER 7 <br />CALENDAR DAYS AND <br />WITHIN 24 HOURS OF A RAIN <br />EVENT > 1.0" IN 24 HOURS <br />01. IDENTIFICATION OF THE MEASURES INSPECTED, <br />02. DATE AND TIME OF THE INSPECTION, <br />03. NAME OF THE PERSON PERFORMING THE INSPECTION, <br />04. INDICATION OF WHETHER THE MEASURES WERE OPERATING <br />PROPERLY, <br />05. DESCRIPTION OF MAINTENANCE NEEDS FOR THE MEASURE, <br />06. DESCRIPTION, EVIDENCE, AND DATE OF CORRECTIVE ACTIONS <br />TAKEN. <br />(3) STORMWATER <br />DISCHARGE OUTFALLS <br />(SDOS) <br />AT LEAST ONCE PER 7 <br />CALENDAR DAYS AND <br />WITHIN 24 HOURS OF A RAIN <br />EVENT > 1.0" IN 24 HOURS <br />01. IDENTIFICATION OF THE DISCHARGE OUTFALLS INSPECTED, <br />02. DATE AND TIME OF THE INSPECTION, <br />03. NAME OF THE PERSON PERFORMING THE INSPECTION, <br />04. EVIDENCE OF INDICATORS OF STORMWATER POLLUTION SUCH AS <br />OIL SHEEN, FLOATING OR SUSPENDED SOLIDS OR DISCOLORATION, <br />05. INDICATION OF VISIBLE SEDIMENT LEAVING THE SITE, <br />06. DESCRIPTION, EVIDENCE, AND DATE OF CORRECTIVE ACTIONS <br />TAKEN. <br />(4) PERIMETER OF SITE <br />AT LEAST ONCE PER 7 <br />CALENDAR DAYS AND <br />WITHIN 24 HOURS OF A RAIN <br />EVENT > 1.0" IN 24 HOURS <br />IF VISIBLE SEDIMENTATION IS FOUND OUTSIDE SITE LIMITS, THEN A <br />RECORD OF THE FOLLOWING SHALL BE MADE: <br />01. ACTIONS TAKEN TO CLEAN UP OR STABILIZE THE SEDIMENT THAT <br />HAS LEFT THE SITE LIMITS, <br />02. DESCRIPTION, EVIDENCE, AND DATE OF CORRECTIVE ACTIONS <br />TAKEN, AND <br />03. AN EXPLANATION AS TO THE ACTIONS TAKEN TO CONTROL FUTURE <br />RELEASES. <br />(5) STREAMS OR <br />WETLANDS ONSITE OR <br />OFFSITE (WHERE <br />ACCESSIBLE) <br />AT LEAST ONCE PER 7 <br />CALENDAR DAYS AND <br />WITHIN 24 HOURS OF A RAIN <br />EVENT > 1.0" IN 24 HOURS <br />IF THE STREAM OR WETLAND HAS INCREASED VISIBLE SEDIMENTATION <br />OR A STREAM HAS VISIBLE INCREASED TURBIDITY FROM THE <br />CONSTRUCTION ACTIVITY, THEN A RECORD OF THE FOLLOWING SHALL <br />BE MADE: <br />01. DESCRIPTION, EVIDENCE AND DATE OF CORRECTIVE ACTIONS <br />TAKEN, AND <br />02. RECORDS OF THE REQUIRED REPORTS TO THE APPROPRIATE <br />DIVISION REGIONAL OFFICE PER PART III, SECTION C, ITEM (2)(A) OF THIS <br />PERMIT. <br />(6) GROUND <br />STABILIZATION <br />MEASURES <br />AFTER EACH PHASE OF <br />GRADING <br />01. THE PHASE OF GRADING (INSTALLATION OF PERIMETER E&SC <br />MEASURES, CLEARING AND GRUBBING, INSTALLATION OF STORM <br />DRAINAGE FACILITIES, COMPLETION OF ALL LAND-DISTURBING ACTIVITY, <br />CONSTRUCTION OR REDEVELOPMENT, PERMANENT GROUND COVER). <br />02. DOCUMENTATION THAT THE REQUIRED GROUND STABILIZATION <br />MEASURES HAVE BEEN PROVIDED WITHIN THE REQUIRED TIMEFRAME <br />OR AN ASSURANCE THAT THEY WILL BE PROVIDED AS SOON AS <br />POSSIBLE. <br />PAINT AND OTHER LIQUID WASTE <br />01. DO NOT DUMP PAINT AND OTHER LIQUID WASTE INTO STORM DRAINS, STREAMS OR WETLANDS. <br />02. LOCATE PAINT WASHOUTS AT LEAST 50 FEET AWAY FROM STORM DRAIN INLETS AND SURFACE WATERS UNLESS NO <br />OTHER ALTERNATIVES ARE REASONABLY AVAILABLE. <br />03. CONTAIN LIQUID WASTES IN A CONTROLLED AREA. <br />04. CONTAINMENT MUST BE LABELED, SIZED AND PLACED APPROPRIATELY FOR THE NEEDS OF SITE. <br />05. PREVENT THE DISCHARGE OF SOAPS, SOLVENTS, DETERGENTS AND OTHER LIQUID WASTES FROM CONSTRUCTION <br />SITES. <br />PORTABLE TOILETS <br />01. INSTALL PORTABLE TOILETS ON LEVEL GROUND, AT LEAST 50 FEET AWAY FROM STORM DRAINS, STREAMS OR <br />WETLANDS UNLESS THERE IS NO ALTERNATIVE REASONABLY AVAILABLE. IF 50 FOOT OFFSET IS NOT ATTAINABLE, PROVIDE <br />RELOCATION OF PORTABLE TOILET BEHIND SILT FENCE OR PLACE ON A GRAVEL PAD AND SURROUND WITH SAND BAGS. <br />02. PROVIDE STAKING OR ANCHORING OF PORTABLE TOILETS DURING PERIODS OF HIGH WINDS OR IN HIGH FOOT <br />TRAFFIC AREAS. <br />03. MONITOR PORTABLE TOILETS FOR LEAKING AND PROPERLY DISPOSE OF ANY LEAKED MATERIAL. UTILIZE A LICENSED <br />SANITARY WASTE HAULER TO REMOVE LEAKING PORTABLE TOILETS AND REPLACE WITH PROPERLY OPERATING UNIT. <br />HERBICIDES, PESTICIDES AND RODENTICIDES <br />01. STORE AND APPLY HERBICIDES, PESTICIDES AND RODENTICIDES IN ACCORDANCE WITH LABEL RESTRICTIONS. <br />02. STORE HERBICIDES, PESTICIDES AND RODENTICIDES IN THEIR ORIGINAL CONTAINERS WITH THE LABEL, WHICH LISTS <br />DIRECTIONS FOR USE, INGREDIENTS AND FIRST AID STEPS IN CASE OF ACCIDENTAL POISONING. <br />03. DO NOT STORE HERBICIDES, PESTICIDES AND RODENTICIDES IN AREAS WHERE FLOODING IS POSSIBLE OR WHERE THEY <br />MAY SPILL OR LEAK INTO WELLS, STORMWATER DRAINS, GROUND WATER OR SURFACE WATER. IF A SPILL OCCURS, CLEAN <br />AREA IMMEDIATELY. <br />04. DO NOT STOCKPILE THESE MATERIALS ONSITE. <br />EARTHEN STOCKPILE MANAGEMENT <br />01. SHOW STOCKPILE LOCATIONS ON PLANS. LOCATE EARTHEN-MATERIAL STOCKPILE AREAS AT LEAST 50 FEET AWAY <br />FROM STORM DRAIN INLETS, SEDIMENT BASINS, PERIMETER SEDIMENT CONTROLS AND SURFACE WATERS UNLESS IT CAN <br />BE SHOWN NO OTHER ALTERNATIVES ARE REASONABLY AVAILABLE. <br />02. PROTECT STOCKPILE WITH SILT FENCE INSTALLED ALONG TOE OF SLOPE WITH A MINIMUM OFFSET OF FIVE FEET FROM <br />THE TOE OF STOCKPILE. <br />03. PROVIDE STABLE STONE ACCESS POINT WHEN FEASIBLE. <br />04. STABILIZE STOCKPILE WITHIN THE TIMEFRAMES PROVIDED ON THIS SHEET AND IN ACCORDANCE WITH THE APPROVED <br />PLAN AND ANY ADDITIONAL REQUIREMENTS. SOIL STABILIZATION IS DEFINED AS VEGETATIVE, PHYSICAL OR CHEMICAL <br />COVERAGE TECHNIQUES THAT WILL RESTRAIN ACCELERATED EROSION ON DISTURBED SOILS FOR TEMPORARY OR <br />PERMANENT CONTROL NEEDS. <br />OCCURRENCE REPORTING TIMEFRAMES (AFTER DISCOVERY) AND OTHER REQUIREMENT <br />(A) VISIBLE SEDIMENT <br />DEPOSITION IN A STREAM <br />OR WETLAND <br />· WITHIN 24 HOURS, AN ORAL OR ELECTRONIC NOTIFICATION. <br />· WITHIN 7 CALENDAR DAYS, A REPORT THAT CONTAINS A DESCRIPTION OF THE <br />SEDIMENT AND ACTIONS TAKEN TO ADDRESS THE CAUSE OF THE DEPOSITION. <br />DIVISION STAFF MAY WAIVE THE REQUIREMENT FOR A WRITTEN REPORT ON A <br />CASE-BY-CASE BASIS. <br />· IF THE STREAM IS NAMED ON THE NC 303(D) LIST AS IMPAIRED FOR <br />SEDIMENT-RELATED CAUSES, THE PERMITTEE MAY BE REQUIRED TO PERFORM <br />ADDITIONAL MONITORING, INSPECTIONS OR APPLY MORE STRINGENT <br />PRACTICES IF STAFF DETERMINE THAT ADDITIONAL REQUIREMENTS ARE <br />NEEDED TO ASSURE COMPLIANCE WITH THE FEDERAL OR STATE <br />IMPAIRED-WATERS CONDITIONS. <br />(B) OIL SPILLS AND <br />RELEASE OF HAZARDOUS <br />SUBSTANCES PER ITEM <br />1(B)-(C) ABOVE <br />WITHIN 24 HOURS, AN ORAL OR ELECTRONIC NOTIFICATION. THE NOTIFICATION <br />SHALL INCLUDE INFORMATION ABOUT THE DATE, TIME, NATURE, VOLUME AND <br />LOCATION OF THE SPILL OR RELEASE. <br />(C) ANTICIPATED BYPASSES <br />[40 CFR 122.41(M)(3)] <br />· A REPORT AT LEAST TEN DAYS BEFORE THE DATE OF THE BYPASS, IF <br />POSSIBLE. THE REPORT SHALL INCLUDE AN EVALUATION OF THE ANTICIPATED <br />QUALITY AND EFFECT OF THE BYPASS. <br />(D) UNANTICIPATED <br />BYPASSES [40 CFR <br />122.41(M)(3)] <br />· WITHIN 24 HOURS, AN ORAL OR ELECTRONIC NOTIFICATION. <br />· WITHIN 7 CALENDAR DAYS, A REPORT THAT INCLUDES AN EVALUATION OF THE <br />QUALITY AND EFFECT OF THE BYPASS. <br />(E) NONCOMPLIANCE WITH <br />THE CONDITIONS OF THIS <br />PERMIT THAT MAY <br />ENDANGER HEALTH OR THE <br />ENVIRONMENT[40 CFR <br />122.41(L)(7)] <br />· WITHIN 24 HOURS, AN ORAL OR ELECTRONIC NOTIFICATION. <br />· WITHIN 7 CALENDAR DAYS, A REPORT THAT CONTAINS A DESCRIPTION OF THE <br />NONCOMPLIANCE, AND ITS CAUSES; THE PERIOD OF NONCOMPLIANCE, <br />INCLUDING EXACT DATES AND TIMES, AND IF THE NONCOMPLIANCE HAS NOT <br />BEEN CORRECTED, THE ANTICIPATED TIME NONCOMPLIANCE IS EXPECTED TO <br />CONTINUE; AND STEPS TAKEN OR PLANNED TO REDUCE, ELIMINATE, AND <br />PREVENT REOCCURRENCE OF THE NONCOMPLIANCE. [40 CFR 122.41(L)(6). <br />· DIVISION STAFF MAY WAIVE THE REQUIREMENT FOR A WRITTEN REPORT ON A <br />CASE-BY-CASE BASIS. <br />PART III <br />SELF-INSPECTION, RECORDKEEPING AND REPORTING <br />SECTION C: REPORTING <br />01. OCCURRENCES THAT MUST BE REPORTED <br />PERMITTEES SHALL REPORT THE FOLLOWING OCCURRENCES: <br />(A) VISIBLE SEDIMENT DEPOSITION IN A STREAM OR WETLAND. <br />(B) OIL SPILLS IF THEY: <br />-ARE 25 GALLONS OR MORE <br />-ARE LESS THAN 25 BUT CANNOT BE CLEANED UP WITHIN 24 HOURS <br />-CAUSE SHEEN ON SURFACE WATERS (REGARDLESS OF VOLUME) <br />-ARE WITHIN 100' OF SURFACE WATERS (REGARDLESS OF VOLUME) <br />(C) RELEASES OF HAZARDOUS SUBSTANCES IN EXCESS OF REPORTABLE QUANTITIES UNDER SECTION 311 <br />OF THE CLEAN WATER ACT (REF: 40 CFR110.3 AND 40 REF CFR117.3) OR SECTION 102 OF CERCLA (REF <br />CFR302.4) OR G.S. 143-215.85. <br />(D) ANTICIPATED BYPASSES AND UNANTICIPATED BYPASSES. <br />(E) NONCOMPLIANCE WITH THE CONDITIONS OF THIS PERMIT THAT MAY ENDAGER HEALTH OR THE <br />ENVIRONMENT. <br />02. REPORTING TIMEFRAMES AND OTHER REQUIREMENTS <br />AFTER A PERMITTEE BECOMES AWARE OF AN OCCURRENCE THAT MUST BE REPORTED, HE SHALL CONTACT THE <br />APPROPRIATE DIVISION REGIONAL OFFICE WITHIN THE TIMEFRAMES AND IN ACCORDANCE WITH THE OTHER <br />REQUIREMENTS LISTED BELOW. OCCURRENCES OUTSIDE NORMAL BUSINESS HOURS MAY ALSO BE REPORTED TO <br />THE DEPARTMENT'S ENVIRONMENTAL EMERGENCY CENTER PERSONNEL AT (800) 858-0368. <br />GROUND STABILIZATION AND MATERIALS HANDLING PRACTICES FOR COMPLIANCE WITH THE NCG01 CONSTRUCTION <br />GENERAL PERMIT <br />IMPLEMENTING THE DETAILS AND SPECIFICATIONS ON THIS PLAN SHEET WILL RESULT IN THE CONSTRUCTION ACTIVITY <br />BEING CONSIDERED COMPLIANT WITH THE GROUND STABILIZATION AND MATERIALS HANDLING SECTIONS OF THE NCG01 <br />CONSTRUCTION GENERAL PERMIT (SECTIONS E AND F, RESPECTIVELY). THE PERMITTEE SHALL COMPLY WITH THE <br />EROSION AND SEDIMENT CONTROL PLAN APPROVED BY THE DELEGATED AUTHORITY HAVING JURISDICTION. ALL DETAILS <br />AND SPECIFICATIONS SHOWN ON THIS SHEET MAY NOT APPLY DEPENDING ON SITE CONDITIONS AND THE DELEGATED <br />AUTHORITY HAVING JURISDICTION. <br />GROUND STABILIZATION SPECIFICATION <br />STABILIZE THE GROUND SUFFICIENTLY SO THAT RAIN WILL NOT DISLODGE THE SOIL. USE ONE OF THE TECHNIQUES IN <br />THE TABLE BELOW: <br />SECTION E: GROUND STABILIZATION <br />NOTE: AFTER THE PERMANENT CESSATION OF CONSTRUCTION ACTIVITIES, ANY AREAS WITH TEMPORARY GROUND <br />STABILIZATION SHALL BE CONVERTED TO PERMANENT GROUND STABILIZATION AS SOON AS PRACTICABLE BUT IN NO <br />CASE LONGER THAN 90 CALENDAR DAYS AFTER THE LAST LAND DISTURBING ACTIVITY. TEMPORARY GROUND <br />STABILIZATION SHALL BE MAINTAINED IN A MANNER TO RENDER THE SURFACE STABLE AGAINST ACCELERATED EROSION <br />UNTIL PERMANENT GROUND STABILIZATION IS ACHIEVED. <br />TEMPORARY SEEDING PERMANENT STABILIZATION <br />· TEMPORARY GRASS SEED COVERED WITH STRAW OR <br />OTHER MULCHES AND TACKIFIERS <br />· HYDROSEEDING <br />· ROLLED EROSION CONTROL PRODUCTS WITH OR <br />WITHOUT TEMPORARY GRASS SEED <br />· APPROPRIATELY APPLIED STRAW OR OTHER MULCH <br />PLASTIC SHEETING <br />· PERMANENT GRASS SEED COVERED WITH STRAW OR <br />OTHER MULCHES AND TACKIFIERS <br />· GEOTEXTILE FABRICS SUCH AS PERMANENT SOIL <br />REINFORCEMENT MATTING <br />· HYDROSEEDING <br />· SHRUBS OR OTHER PERMANENT PLANTINGS <br />COVERED WITH MULCH <br />· UNIFORM AND EVENLY DISTRIBUTED GROUND COVER <br />SUFFICIENT TO RESTRAIN EROSION <br />· STRUCTURAL METHODS SUCH AS CONCRETE, <br />ASPHALT OR RETAINING WALLS <br />· ROLLED EROSION CONTROL PRODUCTS WITH GRASS <br />SEED <br />STABILIZATION TIMEFRAMES <br />SITE AREA DESCTIPTION TIMEFRAME (CALENDAR DAYS AFTER <br />CEASING LAND DISTURBANCE)TIMEFRAME EXCEPTIONS <br />PERIMETER DIKES, SWALES, <br />DITCHES, SLOPES 7 NONE <br />HIGH QUALITY WATER (HQW) ZONES 7 NONE <br />SLOPES STEEPER THAN 3:1 7 <br />14 DAYS FOR SLOPES THAT ARE <br />10' OR LESS IN LENGTH AND ARE <br />NOT STEEPER THAN 2:1. <br />SLOPES 3:1 - 4:1 14 <br />7 DAYS FOR SLOPES GREATER <br />THAN 5" LENGTH. <br />7 DAYS FOR PERIMETER DIKES, <br />SWALES, DITCHES, PERIMETER <br />SLOPES, AND HQW ZONES. <br />ALL OTHER AREAS WITH SLOPES <br />FLATTER THAN 4:1 14 <br />7 DAYS FOR PERIMETER DIKES, <br />SWALES, DITCHES, PERIMETER <br />SLOPES, AND HQW ZONES.NOTES - NCG01G03 <br />Docusign Envelope ID: 34F94CE0-2CE8-49C5-B7C4-6B696F8E23C3