Browse
Search
2025-722-E-Solid Waste-Central Builder Inc. of Mebane-Booth installation
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2025
>
2025-722-E-Solid Waste-Central Builder Inc. of Mebane-Booth installation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2025 1:20:16 PM
Creation date
12/11/2025 1:16:43 PM
Metadata
Fields
Template:
Contract
Date
11/26/2025
Contract Starting Date
11/26/2025
Contract Ending Date
12/2/2025
Contract Document Type
Contract
Amount
$229,000.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
223
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Attendant Booth Additions 32 11 23 - 1 <br />Orange County, North Carolina AUGUST 2025 <br />TRC PN: 670493 <br /> <br />SECTION 32 11 23 – AGGREGATE BASE COURSE <br /> <br />PART 1 - GENERAL <br /> <br />1.1 DESCRIPTION OF WORK <br /> <br />A. The Contractor shall comply with each and every requirement of this <br />Section 32 11 23, “Aggregate Base Course”. To the extent any <br />requirement in Aggregate Base Course conflicts with any other provision <br />of this Contract, the provisions in Aggregate Base Course shall control. <br /> <br />B. Work under this section consists of furnishing all plant, labor, materials, <br />and equipment for the construction of an aggregate base composed of <br />approved aggregate materials hauled to the parking/drive area, placed on <br />the prepared subgrade, compacted, and shaped to conform to the lines, <br />grade, depths, and typical cross-sections indicated on the plans. <br /> <br />C. Drawings and general provisions of the Contract, including General and <br />Supplementary Conditions and Division I Specification Sections, apply to <br />this Section. <br /> <br />1.2 RELATED WORK IN OTHER SECTIONS <br /> <br />A. Earthwork: Section 31 00 00 <br />B. Asphalt Pavement: Section 32 12 16 <br /> <br />1.3 QUALITY ASSURANCE <br /> <br />The source and type of aggregate base course shall be approved by the <br />Engineer prior to placement. If requested, samples of the materials shall be <br />submitted to the Engineer for approval. <br /> <br />PART 2 - PRODUCTS <br /> <br />2.1 Aggregate base course shall consist of crushed stone or crushed gravel and <br />shall conform to the requirements of Section 520 of the N.C. Department of <br />Transportation Standard Specifications for Roads and Structures. <br /> <br />2.2 Asphalt prime coat shall consist of 0.4 to 0.6 gallons per square yard of medium <br />curing asphalt. Prime coat shall be asphalt grade RC-30 meeting the latest <br />AASHTO specifications for that grade. <br /> <br />PART 3 - EXECUTION <br /> <br />3.1 HAULING AND PLACING MATERIALS <br /> <br />Docusign Envelope ID: 34F94CE0-2CE8-49C5-B7C4-6B696F8E23C3
The URL can be used to link to this page
Your browser does not support the video tag.