Browse
Search
2025-722-E-Solid Waste-Central Builder Inc. of Mebane-Booth installation
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2025
>
2025-722-E-Solid Waste-Central Builder Inc. of Mebane-Booth installation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2025 1:20:16 PM
Creation date
12/11/2025 1:16:43 PM
Metadata
Fields
Template:
Contract
Date
11/26/2025
Contract Starting Date
11/26/2025
Contract Ending Date
12/2/2025
Contract Document Type
Contract
Amount
$229,000.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
223
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Attendant Booth Additions 31 20 00 - 6 <br />Orange County, North Carolina AUGUST 2025 <br />TRC PN: 670493 <br /> <br />1. Stockpile soil materials away from edge of excavations. Do not store <br />within drip line of remaining trees. <br />3.9 UTILITY TRENCH BACKFILL <br />A. Place backfill on subgrades free of mud, frost, snow, or ice. <br />B. Place and compact bedding course on trench bottoms and where indicated. <br />Shape bedding course to provide continuous support for bells, joints, and <br />barrels of pipes and for joints, fittings, and bodies of conduits. <br />C. Place and compact initial backfill of subbase material, free of particles larger <br />than 1 inch in any dimension, to a height of 12 inches over the utility pipe or <br />conduit. <br />1. Carefully compact initial backfill under pipe haunches and compact evenly <br />up on both sides and along the full length of utility piping or conduit to <br />avoid damage or displacement of piping or conduit. Coordinate backfilling <br />with utilities testing. <br />D. Place and compact final backfill of satisfactory soil to final subgrade elevation. <br />E. Install warning tape directly above utilities, 12 inches below finished grade, <br />except 6 inches below subgrade under pavements and slabs. <br />3.10 SOIL FILL <br />A. Plow, scarify, bench, or break up sloped surfaces steeper than 1 vertical to 4 <br />horizontal so fill material will bond with existing material. <br />B. Place and compact fill material in layers to required elevations as follows: <br />1. Under grass and planted areas, use satisfactory soil material. <br />2. Under walks and pavements, use satisfactory soil material. <br />3. Under building slabs, use engineered fill. <br />4. Under footings and foundations, use engineered fill. <br />3.11 SOIL MOISTURE CONTROL <br />A. Uniformly moisten or aerate subgrade and each subsequent fill or backfill soil <br />layer before compaction to within 2 percent of optimum moisture content. <br />1. Do not place backfill or fill soil material on surfaces that are muddy, frozen, <br />or contain frost or ice. <br />Docusign Envelope ID: 34F94CE0-2CE8-49C5-B7C4-6B696F8E23C3
The URL can be used to link to this page
Your browser does not support the video tag.