Browse
Search
2025-722-E-Solid Waste-Central Builder Inc. of Mebane-Booth installation
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2025
>
2025-722-E-Solid Waste-Central Builder Inc. of Mebane-Booth installation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2025 1:20:16 PM
Creation date
12/11/2025 1:16:43 PM
Metadata
Fields
Template:
Contract
Date
11/26/2025
Contract Starting Date
11/26/2025
Contract Ending Date
12/2/2025
Contract Document Type
Contract
Amount
$229,000.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
223
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Attendant Booth Additions 31 20 00 - 4 <br />Orange County, North Carolina AUGUST 2025 <br />TRC PN: 670493 <br /> <br />PART 3 - EXECUTION <br />3.1 PREPARATION <br />A. Protect structures, utilities, sidewalks, pavements, and other facilities from <br />damage caused by settlement, lateral movement, undermining, washout, and <br />other hazards created by earthwork operations. <br />B. Preparation of subgrade for earthwork operations including removal of <br />vegetation, topsoil, debris, obstructions, and deleterious materials from ground <br />surface is specified in Division 2 Section "Site Clearing." <br />C. Protect and maintain erosion and sedimentation controls, which are specified in <br />Division 2 Section "Site Clearing," during earthwork operations. <br />3.2 EXCAVATION <br />A. Unclassified Excavation: Excavate to subgrade elevations regardless of the <br />character of surface and subsurface conditions encountered. Unclassified <br />excavated materials may include rock, soil materials, and obstructions. No <br />changes in the Contract Sum or the Contract Time will be authorized for rock <br />excavation or removal of obstructions. <br />1. If excavated materials intended for fill and backfill include unsatisfactory <br />soil materials and rock, replace with satisfactory soil materials. <br />3.3 EXCAVATION FOR STRUCTURES <br />A. Excavate to indicated elevations and dimensions within a tolerance of plus or <br />minus 1 inch. If applicable, extend excavations a sufficient distance from <br />structures for placing and removing concrete formwork, for installing services <br />and other construction, and for inspections. <br />1. Excavations for Footings and Foundations: Do not disturb bottom of <br />excavation. Excavate by hand to final grade just before placing concrete <br />reinforcement. Trim bottoms to required lines and grades to leave solid <br />base to receive other work. <br />3.4 EXCAVATION FOR WALKS AND PAVEMENTS <br />A. Excavate surfaces under walks and pavements to indicated lines, cross <br />sections, elevations, and subgrades. <br />Docusign Envelope ID: 34F94CE0-2CE8-49C5-B7C4-6B696F8E23C3
The URL can be used to link to this page
Your browser does not support the video tag.