Browse
Search
2025-722-E-Solid Waste-Central Builder Inc. of Mebane-Booth installation
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2025
>
2025-722-E-Solid Waste-Central Builder Inc. of Mebane-Booth installation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2025 1:20:16 PM
Creation date
12/11/2025 1:16:43 PM
Metadata
Fields
Template:
Contract
Date
11/26/2025
Contract Starting Date
11/26/2025
Contract Ending Date
12/2/2025
Contract Document Type
Contract
Amount
$229,000.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
223
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Attendant Booth Additions 31 20 00 - 1 <br />Orange County, North Carolina AUGUST 2025 <br />TRC PN: 670493 <br /> <br />SECTION 31 20 00 <br />EARTHWORK <br />PART 1 - GENERAL <br />1.1 SUMMARY <br />A. This Section includes the following: <br />1. Preparing subgrades for slabs-on-grade and pavements. <br />2. Excavating and backfilling for buildings and structures. <br />3. Drainage course for slabs-on-grade. <br />4. Subbase course for concrete pavements. <br />5. Subbase and base course for asphalt paving. <br />6. Excavating and backfilling for utility trenches. <br />1.2 DEFINITIONS <br />A. Backfill: Soil material used to fill an excavation. <br />1. Initial Backfill: Backfill placed beside and over pipe in a trench, including <br />haunches to support sides of pipe. <br />2. Final Backfill: Backfill placed over initial backfill to fill a trench or other <br />large area requiring fill. <br />B. Base Course: Course placed between the subbase course and hot -mix asphalt <br />paving. <br />C. Bedding Course: Course placed over the excavated subgrade in a trench <br />before laying pipe. <br />D. Borrow Soil: Satisfactory soil imported from off-site for use as fill or backfill. <br />E. Drainage Course: Course supporting the slab -on-grade that also minimizes <br />upward capillary flow of pore water. <br />F. Excavation: Removal of material encountered above subgrade elevations and <br />to lines and dimensions indicated. <br />1. Authorized Additional Excavation: Excavation below subgrade elevations <br />or beyond indicated lines and dimensions as directed by Engineer. <br />Authorized additional excavation and replacement material will be paid for <br />according to Contract provisions changes in the Work. <br />Docusign Envelope ID: 34F94CE0-2CE8-49C5-B7C4-6B696F8E23C3
The URL can be used to link to this page
Your browser does not support the video tag.