Browse
Search
2025-722-E-Solid Waste-Central Builder Inc. of Mebane-Booth installation
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2025
>
2025-722-E-Solid Waste-Central Builder Inc. of Mebane-Booth installation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2025 1:20:16 PM
Creation date
12/11/2025 1:16:43 PM
Metadata
Fields
Template:
Contract
Date
11/26/2025
Contract Starting Date
11/26/2025
Contract Ending Date
12/2/2025
Contract Document Type
Contract
Amount
$229,000.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
223
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Attendant Booth Additions 31 10 00 - 2 <br />Orange County, North Carolina AUGUST 2025 <br />TRC PN: 670493 <br /> <br />PART 2 - PRODUCTS (Not Applicable) <br />PART 3 - EXECUTION <br />3.1 PREPARATION <br />A. Fully document the existing conditions of the site by photograph or video prior <br />to commencing the work. <br />B. Protect and maintain benchmarks and survey control points from disturbance <br />during construction. <br />C. Locate and clearly flag trees and vegetation to remain or to be relocated. <br />D. Protect existing site improvements to remain from damage during construction. <br />1. Restore damaged improvements to their original condition, as acceptable <br />to Owner. <br />3.2 TEMPORARY EROSION AND SEDIMENTATION CONTROL <br />A. Provide temporary erosion and sedimentation control measures to prevent soil <br />erosion and discharge of soil-bearing water runoff or airborne dust to adjacent <br />properties and walkways, according to requirements of the North Carolina <br />Department of Environmental Quality, Division of Land Quality, all applicable <br />regulations, and per the sediment and erosion control drawings. <br />B. Inspect, repair, and maintain erosion and sedimentation control measures <br />during construction until permanent vegetation has been established. <br />Inspections should be made immediately after any precipitation event and <br />Contractor shall document inspections by ways of a written log and <br />photographs. These logs and photographs shall be made available to the <br />Engineer or Owner immediately upon request. <br />C. Remove erosion and sedimentation controls and restore and stabilize areas <br />disturbed during removal. <br />3.3 UTILITIES <br />A. Locate, identify, disconnect, and seal or cap off utilities indicated to be <br />removed. <br />1. Arrange with utility companies to shut off indicated utilities. <br />Docusign Envelope ID: 34F94CE0-2CE8-49C5-B7C4-6B696F8E23C3
The URL can be used to link to this page
Your browser does not support the video tag.