Browse
Search
2025-722-E-Solid Waste-Central Builder Inc. of Mebane-Booth installation
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2025
>
2025-722-E-Solid Waste-Central Builder Inc. of Mebane-Booth installation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2025 1:20:16 PM
Creation date
12/11/2025 1:16:43 PM
Metadata
Fields
Template:
Contract
Date
11/26/2025
Contract Starting Date
11/26/2025
Contract Ending Date
12/2/2025
Contract Document Type
Contract
Amount
$229,000.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
223
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Attendant Booth Additions 03 30 00 - 6 <br />Orange County, North Carolina AUGUST 2025 <br />TRC PN: 670493 <br /> <br />3.4 JOINTS <br />A. General: Construct joints true to line with faces perpendicular to surface plane <br />of concrete. <br />B. Construction Joints: Install so strength and appearance of concrete are not <br />impaired, at locations indicated or as approved by Architect. <br />3.5 WATERSTOP INSTALLATION <br />A. Waterstops: Install in construction joints and at other locations indicated, <br />according to manufacturer's written instructions. <br />3.6 CONCRETE PLACEMENT <br />A. Before placing concrete, verify that installation of formwork, reinforcement, and <br />embedded items is complete and that required inspections are completed. <br />B. Deposit concrete continuously in one layer or in horizontal layers of such <br />thickness that no new concrete is placed on concrete that has hardened <br />enough to cause seams or planes of weakness. If a section cannot be placed <br />continuously, provide construction joints as indicated. Deposit concrete to avoid <br />segregation. <br />1. Consolidate placed concrete with mechanical vibrating equipment <br />according to ACI 301 . <br />3.7 FINISHING FORMED SURFACES <br />A. Rough-Formed Finish: As-cast concrete texture imparted by form-facing <br />material with tie holes and defects repaired and patched. Remove fins and <br />other projections that exceed specified limits on formed-surface irregularities. <br />1. Apply to concrete surfaces not exposed to view. <br />B. Smooth-Formed Finish: As-cast concrete texture imparted by form-facing <br />material, arranged in an orderly and symmetrical manner with a minimum of <br />seams. Repair and patch tie holes and defects. Remove fins and other <br />projections that exceed specified limits on formed -surface irregularities. <br />1. Apply to concrete surfaces exposed to view, to receive a rubbed finish, <br />or to be covered with a coating or covering material applied directly <br />to concrete. <br />Docusign Envelope ID: 34F94CE0-2CE8-49C5-B7C4-6B696F8E23C3
The URL can be used to link to this page
Your browser does not support the video tag.