Browse
Search
2025-722-E-Solid Waste-Central Builder Inc. of Mebane-Booth installation
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2025
>
2025-722-E-Solid Waste-Central Builder Inc. of Mebane-Booth installation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2025 1:20:16 PM
Creation date
12/11/2025 1:16:43 PM
Metadata
Fields
Template:
Contract
Date
11/26/2025
Contract Starting Date
11/26/2025
Contract Ending Date
12/2/2025
Contract Document Type
Contract
Amount
$229,000.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
223
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Attendant Booth Additions 01 70 00 - 1 <br />Orange County, North Carolina AUGUST 2025 <br />TRC PN: 670493 <br /> <br />SECTION 01 70 00 – CONTRACT CLOSEOUT <br /> <br />PART 1 GENERAL <br /> <br />SUMMARY <br />Section Includes: <br />Description of procedures to be followed and related work required to accomplish <br />an orderly transfer of Project deliverables from the Contractor to the Owner. <br />Related Sections include but are not necessarily limited to: <br /> <br />1. Front End Documents: Bid Requirements, Contract Forms, and Conditions <br />of the Contract. <br />2. Division I - General Requirements. <br />1.2 DEFINITIONS <br /> <br />A. Punch List: The stated qualification accompanying either the Engineer's <br />Certificate of Substantial Completion or the Certificate of Final Payment, or <br />any list of construction items found to be deficient or incomplete through <br />review of the Work by Engineer and communicated in writing to Contractor <br />at any time during the Contract Period. <br /> <br />B. Record Drawings: Drawings showing changes made during actual <br />construction. <br /> <br />1.3 SUBMITTALS <br /> <br />A. Substantial Completion: <br /> <br /> 1. Contractor to notify Engineer that the Contractor considers the Work <br />as a whole to be in Substantial Completion and request for a <br />Substantial Completion inspection. <br />B. Final Completion: <br /> <br /> 1. Contractor to notify Engineer that the Contractor considers the entire <br />Work to have progressed to final completion. <br /> <br /> 2. When Final Completion and Substantial Completion are coincidental: <br /> <br /> a. Submittals required for Substantial Completion, and; <br /> b. Record Drawings; <br /> c. As-built survey performed by Licensed Surveyor. <br /> d. Lien waivers, if requested by Owner; <br /> e. Evidence of payments, if requested by Owner. <br /> <br />Docusign Envelope ID: 34F94CE0-2CE8-49C5-B7C4-6B696F8E23C3
The URL can be used to link to this page
Your browser does not support the video tag.