Browse
Search
2025-722-E-Solid Waste-Central Builder Inc. of Mebane-Booth installation
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2025
>
2025-722-E-Solid Waste-Central Builder Inc. of Mebane-Booth installation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2025 1:20:16 PM
Creation date
12/11/2025 1:16:43 PM
Metadata
Fields
Template:
Contract
Date
11/26/2025
Contract Starting Date
11/26/2025
Contract Ending Date
12/2/2025
Contract Document Type
Contract
Amount
$229,000.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
223
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Attendant Booth Additions 01 33 00 - 6 <br />Orange County, North Carolina AUGUST 2025 <br />TRC PN: 670493 <br /> <br />1. Submit manufacturers’ installation procedures to Engineer for review <br /> in the quantities specified for Shop Drawings. <br /> <br /> F. Samples <br /> <br /> 1. Submit samples as required by the individual specification sections. <br /> Samples shall be physical examples to illustrate the materials and <br /> workmanship. Submit in sufficient size and quantity to clearly <br /> illustrate the functional characteristics of the Product, with integrally <br /> related parts and attachment devices, and the full range of color to <br /> be provided. <br /> <br /> G. Warranties <br /> <br /> 1. Provide copies of Product warranties as required by the individual <br /> sections of the specifications. <br />2. Provide duplicate notarized copies. <br /> <br />3. Execute and assemble documents from Subcontractors, suppliers, <br /> and manufacturers. <br /> <br />4. Provide Table of Contents and assemble in three D side ring binder <br /> with durable plastic cover. <br /> <br />5. Submit prior to final Application for Payment. <br /> <br />c. For items of Work delayed beyond date of Substantial Completion, <br /> provide updated submittal within 10 days after acceptance, listing <br /> date of acceptance as start of warranty period. <br /> <br /> H. Spare Parts and Maintenance Materials <br /> <br /> 1. Provide recommended manufacturer’s list of spare parts, <br /> maintenance, and extra material as specified in individual sections. <br /> <br /> <br /> <br /> <br />END OF SECTION 01 33 00 <br /> <br /> <br /> <br /> <br /> <br />Docusign Envelope ID: 34F94CE0-2CE8-49C5-B7C4-6B696F8E23C3
The URL can be used to link to this page
Your browser does not support the video tag.