Browse
Search
2025-722-E-Solid Waste-Central Builder Inc. of Mebane-Booth installation
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2025
>
2025-722-E-Solid Waste-Central Builder Inc. of Mebane-Booth installation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2025 1:20:16 PM
Creation date
12/11/2025 1:16:43 PM
Metadata
Fields
Template:
Contract
Date
11/26/2025
Contract Starting Date
11/26/2025
Contract Ending Date
12/2/2025
Contract Document Type
Contract
Amount
$229,000.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
223
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Attendant Booth Additions 01 33 00 - 4 <br />Orange County, North Carolina AUGUST 2025 <br />TRC PN: 670493 <br /> <br /> <br /> 3. Record information concurrent with construction progress. <br /> <br /> 4. Specifications: Legibly mark and record at each Product section <br /> description of actual Products installed, including the following: <br /> <br /> a. Manufacturer’s name, product model and number <br /> b. Product substitutions or alternates utilized <br /> c. Changes made by Addenda and Modifications <br /> <br /> 5. Record Documents and Shop Drawings: Legibly mark each item <br /> to record actual construction including: <br /> <br /> a. Measure and reference horizontal and vertical locations of <br /> underground utilities and appurtenances to permanent <br /> surface improvements. <br /> b. Field changes from construction Drawings. <br /> c. Details not on original Contract Drawings. <br /> <br /> 6. Submit documents to engineer with final Application for Payment. <br /> <br />1.4 TECHNICAL SUBMITTALS <br /> <br />A. General: Submit the following, in the number indicated, as required by the <br />individual sections of the technical specifications. <br /> <br />B. Certificates of Compliance <br /> <br />1. Submit Manufacturer’s Certificates of Compliance, in quantities <br /> specified for Shop Drawings. <br /> <br />2. Certificates shall certify that the Products delivered to the project <br /> are in conformance with the Specifications. <br /> <br />3. Certificates may be recent or previous test results on Product, but <br /> must be acceptable to Engineer. <br /> <br />4. Certification shall not relieve the Contractor of responsibility for <br /> complying with requirements of the Specifications. <br /> <br /> C. Catalog Data <br />1. Submit copies of manufacturers’ standard catalog cuts of Products <br /> to be used in the Work. <br /> <br />Docusign Envelope ID: 34F94CE0-2CE8-49C5-B7C4-6B696F8E23C3
The URL can be used to link to this page
Your browser does not support the video tag.