Browse
Search
2025-722-E-Solid Waste-Central Builder Inc. of Mebane-Booth installation
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2025
>
2025-722-E-Solid Waste-Central Builder Inc. of Mebane-Booth installation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2025 1:20:16 PM
Creation date
12/11/2025 1:16:43 PM
Metadata
Fields
Template:
Contract
Date
11/26/2025
Contract Starting Date
11/26/2025
Contract Ending Date
12/2/2025
Contract Document Type
Contract
Amount
$229,000.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
223
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Attendant Booth Additions 01 33 00 - 2 <br />Orange County, North Carolina AUGUST 2025 <br />TRC PN: 670493 <br /> <br />7. Manufacturer <br /> <br />E. Apply Contractor’s stamp to each submittal signed or initialed and dated, <br /> certifying that Contractor has reviewed submittal for conformance with <br /> requirements of Contract Documents, and has coordinated submittal with <br /> related work. <br /> <br />F. Schedule submittals to expedite Project, and deliver to coordinate <br />submission of related items. Allow a minimum of fifteen (15) working days <br />for Engineer’s review. <br /> <br />G. Identify variations from Contract Documents and Product limitations as they <br />relate to the satisfactory performance of the Project. <br /> <br />H. Provide space for Contractor and Engineer review stamps. <br /> <br />I. Revise and resubmit submittals as required – identify changes made since <br />previous submittal. <br /> <br />J. Distribute copies of reviewed submittals to concerned parties. Instruct <br />parties to promptly report inability to comply with provisions. <br /> <br />K. Work requiring submittal review by Engineer shall not be started until review <br />has been obtained. <br /> <br />L. Engineer’s review of submittals shall not relieve Contractor of responsibility <br />for complete compliance with Contract Documents. <br /> <br />1.3 ADMINISTRATIVE SUBMITTALS <br /> <br /> A. Construction Progress Schedule <br /> <br />1. Submit five (5) copies of the initial progress schedule 15 days after <br /> date of Owner-Contractor Agreement. One copy shall be returned <br /> to the Contractor. <br /> <br />2. Progress schedule shall be, as a minimum, a horizontal bar chart <br /> with a separate line for each major section of Work. Identify the first <br /> workday of each week. <br /> <br />3. Show complete sequence of construction by activity, identifying <br /> Work of separate stages and other logically grouped activities. <br /> Indicate the early and late start, early and late finish, float dates, <br /> and duration. <br />Docusign Envelope ID: 34F94CE0-2CE8-49C5-B7C4-6B696F8E23C3
The URL can be used to link to this page
Your browser does not support the video tag.