Browse
Search
2025-722-E-Solid Waste-Central Builder Inc. of Mebane-Booth installation
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2025
>
2025-722-E-Solid Waste-Central Builder Inc. of Mebane-Booth installation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2025 1:20:16 PM
Creation date
12/11/2025 1:16:43 PM
Metadata
Fields
Template:
Contract
Date
11/26/2025
Contract Starting Date
11/26/2025
Contract Ending Date
12/2/2025
Contract Document Type
Contract
Amount
$229,000.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
223
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SPECIAL CONDITIONS <br /> <br /> <br />Attendant Booth Additions SC - 20 <br />Orange County, North Carolina AUGUST 2025 <br />TRC PN: 670493 <br /> <br />C. Restore Permanent facilities used for temporary services to specified condition. <br /> <br /> <br />S-33 - FIELD OFFICES <br /> <br />33.1 Scope of Work <br /> <br />A. Furnish, install and maintain temporary field office and furnishings. <br /> <br />B. Furnish, install and maintain storage and work sheds needed for construction. <br /> <br />C. At completion of work, remove field offices, sheds and contents. <br /> <br />D. Contractor shall be responsible for all costs for Items A thru D. <br /> <br />33.2 Submittals <br /> <br />A. Prior to installation of field office, submit to Engineer for review a complete <br />description of proposed location, access, and related data. <br /> <br />33.3 Requirements for Facilities <br /> <br />A. Construction: <br /> <br />1. Structurally sound, weather tight, with floors raised above ground. <br /> <br />2. Temperature transmission resistance: Compatible with occupancy and <br />storage requirements. <br /> <br />3. At Contractor’s option, portable or mobile buildings may be used. <br /> <br />• Mobile trailers, when used, shall be modified for office use. <br />• Do not use mobile trailers for living quarters. <br /> <br />33.4 Materials, Equipment, Furnishings <br /> <br />A. May be new or used, but must be serviceable, adequate for required purpose, <br />and must not violate applicable codes or regulations. <br /> <br />33.5 Preparation <br /> <br />A. Fill and grade sites for temporary structures to provide surface drainage. <br /> <br />33.6 Installation <br /> <br />A. Construct temporary field offices on proper foundations, provide connections for <br />utility services. <br /> <br />1. Secure portable or mobile buildings when used. <br />2. Provide steps and landings complete with hand rails at all entrance doors. <br />Docusign Envelope ID: 34F94CE0-2CE8-49C5-B7C4-6B696F8E23C3
The URL can be used to link to this page
Your browser does not support the video tag.