2025-722-E-Solid Waste-Central Builder Inc. of Mebane-Booth installation
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2025
>
2025-722-E-Solid Waste-Central Builder Inc. of Mebane-Booth installation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2025 1:20:16 PM
Creation date
12/11/2025 1:16:43 PM
Metadata
Fields
Template:
Contract
Date
11/26/2025
Contract Starting Date
11/26/2025
Contract Ending Date
12/2/2025
Contract Document Type
Contract
Amount
$229,000.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
223
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SPECIAL CONDITIONS <br /> <br /> <br />Attendant Booth Additions SC - 18 <br />Orange County, North Carolina AUGUST 2025 <br />TRC PN: 670493 <br /> <br />changes except for unavoidable overall Contract time extensions beyond the <br />actual completion of all unaffected Work in the Contract, in which case the <br />Contractor shall take all possible action to minimize any time extension and any <br />additional cost to the Owner. <br /> <br />30.10 Coordinating Schedules with Other Contract Schedules <br /> <br />A. Where work is to be performed under this contract concurrently with and/or <br />contingent upon work performed on the same facilities or area under other <br />contracts, the Contractor’s schedule shall be coordinated with the schedules of <br />the other contracts. The Contractor shall obtain the schedules of the other <br />appropriate contracts for the preparation and updating of his schedule and shall <br />make the required changes in his schedule when indicated by changes in <br />corresponding schedules. <br /> <br />B. Float Time <br /> <br />1. The Owner controls the float time in the approved schedule and, therefore, <br />without obligation to extend either the overall completion date or any <br />intermediate completion dates set out in the schedule, the Owner may initiate <br />changes to the work that absorb float time only. Owner initiated changes that <br />affect the Critical Path on the approved schedule, shall be the sole grounds <br />for extending said completion dates. Contractor-initiated changes that <br />encroach on the float time identified in the approved schedule may be <br />accomplished with the Owner’s concurrence. Such changes, however, shall <br />give way to Owner-initiated changes competing for the same float time. <br /> <br />S-31 - OMITTED <br /> <br /> <br />S-32 - TEMPORARY UTILITIES <br /> <br />32.1 Requirements Included <br /> <br />A. Furnish, install and maintain temporary utilities required for construction and <br />remove on completion of work. <br /> <br />32.2 Requirements of Regulatory Agencies <br /> <br />A. Comply with National Electric Code. <br /> <br />B. Comply with Federal, State and local codes and regulations and with utility <br />company requirements. <br /> <br />C. Comply with North Carolina Department of Transportation Regulations. <br /> <br />32.3 Materials, General <br /> <br />Docusign Envelope ID: 34F94CE0-2CE8-49C5-B7C4-6B696F8E23C3