Browse
Search
2025-722-E-Solid Waste-Central Builder Inc. of Mebane-Booth installation
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2025
>
2025-722-E-Solid Waste-Central Builder Inc. of Mebane-Booth installation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2025 1:20:16 PM
Creation date
12/11/2025 1:16:43 PM
Metadata
Fields
Template:
Contract
Date
11/26/2025
Contract Starting Date
11/26/2025
Contract Ending Date
12/2/2025
Contract Document Type
Contract
Amount
$229,000.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
223
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SPECIAL CONDITIONS <br /> <br /> <br />Attendant Booth Additions SC - 16 <br />Orange County, North Carolina AUGUST 2025 <br />TRC PN: 670493 <br /> <br /> <br />C. Provide a Monthly Progress Status Report which provides a narrative explanation <br />of progress identified in the revised Construction Schedule. The report shall <br />indicate the following items: <br /> <br />1. Summarize revisions made to the Construction Schedule since the <br />previous submittal. <br />2. Work completed during the reporting period. <br />3. Problem areas, anticipated delays, and the impact on the schedule. <br />4. Corrective action recommended, and its effect. <br />5. The effect of changes on schedules of other prime contractors. <br /> <br />30.5 Submissions <br /> <br />A. Submit initial schedules to the Engineer within 5 days after the effective date of <br />the Agreement. Resubmit revised schedules within 5 days after receiving <br />Engineer’s review comments. <br /> <br />B. Submit revised progress schedule with that month’s application for payment. <br /> <br />C. Submit six (6) copies of Monthly Progress Status Report with progress <br />schedules. Engineer will return one copy with appropriate review comments. <br /> <br />30.6 Distribution <br /> <br />A. Distribute copies of the reviewed schedules to: <br /> <br />1. Engineer. (two copies) <br />2. Contractor’s job site file. <br />3. Subcontractors. <br />4. Other concerned parties. <br />5. Owner (two copies) <br /> <br />B. Instruct recipients to report promptly to the Contractor, in writing, any problems <br />anticipated by the projections shown in the schedules. <br /> <br />30.7 Responsibility for Schedule Compliance <br /> <br />A. The Contractor agrees that whenever it becomes apparent from the current <br />monthly schedule that delays to the project schedule have resulted, and hence, <br />that the contract completion date will not be met, he will take some or all of the <br />following actions at no additional cost to the Owner, submitting to the Owner for <br />approval, a written statement of the steps he intends to take to remove or arrest <br />the delay in the approved schedule. <br /> <br />1. Increased construction manpower in such quantities and crafts as will <br />substantially eliminate the backlog of work. <br />2. Increase the number of working hours per shift, shifts per working days <br />per week, the amount of construction equipment, or any combination of <br />the foregoing, sufficiently to substantially eliminate the backlog of work. <br />Docusign Envelope ID: 34F94CE0-2CE8-49C5-B7C4-6B696F8E23C3
The URL can be used to link to this page
Your browser does not support the video tag.