Browse
Search
2025-722-E-Solid Waste-Central Builder Inc. of Mebane-Booth installation
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2025
>
2025-722-E-Solid Waste-Central Builder Inc. of Mebane-Booth installation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2025 1:20:16 PM
Creation date
12/11/2025 1:16:43 PM
Metadata
Fields
Template:
Contract
Date
11/26/2025
Contract Starting Date
11/26/2025
Contract Ending Date
12/2/2025
Contract Document Type
Contract
Amount
$229,000.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
223
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SPECIAL CONDITIONS <br /> <br /> <br />Attendant Booth Additions SC - 14 <br />Orange County, North Carolina AUGUST 2025 <br />TRC PN: 670493 <br /> <br />29.9 Time and Material/force Account Change Order/Work Directive Change <br /> <br />A. Engineer and Owner will issue a WDC directing Contractor to proceed with the <br />changes. <br /> <br />B. At completion of the change, Contractor shall submit itemized accounting and <br />supporting data as provided in the Article ”Documentation of Proposals and <br />Claims” of this section. <br /> <br />C. Engineer will determine the allowable cost of such work, as provided in General <br />Conditions and Supplementary Conditions. <br /> <br />D. Engineer will sign and date the Change Order to establish the change in Contract <br />Sum and in Contract Time <br /> <br />E. Owner and Contractor will sign and date the Change Order to indicate their <br />agreement therewith. <br /> <br />29.10 Correlation with Contractor’s Submittals <br /> <br />A. Periodically revise Schedule of Values and Request for Payment forms to record <br />each change as a separate item of Work, and to record the adjusted Contract <br />Sum. <br /> <br />B. Periodically revise the Construction Schedule to reflect each change in Contract <br />Time. <br /> <br />• Revise subschedules to show changes for other items of work affected by <br />the changed. <br /> <br />C. Upon completion of work under a Change Order, enter pertinent changes in <br />Record Documents. <br /> <br /> <br />S-30 - CONSTRUCTION SCHEDULES <br /> <br />30. 1 Work Included. <br /> <br />A. Promptly after award of the Contract and within five days after the effective date <br />of the Agreement, prepare and submit to the Engineer estimated construction <br />progress schedules for the Work, with subschedules of related activities which <br />are essential to its progress. Construction Progress Schedule shall indicate <br />times when interruptions of normal sewer service will occur. The Contractor will <br />coordinate this work with the Owner, giving the Owner ample opportunity to notify <br />the property owners of the time, place, and extent of the interruption. <br /> <br />B. Submit revised progress schedules on a monthly basis. <br /> <br />Docusign Envelope ID: 34F94CE0-2CE8-49C5-B7C4-6B696F8E23C3
The URL can be used to link to this page
Your browser does not support the video tag.