Browse
Search
2025-722-E-Solid Waste-Central Builder Inc. of Mebane-Booth installation
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2025
>
2025-722-E-Solid Waste-Central Builder Inc. of Mebane-Booth installation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2025 1:20:16 PM
Creation date
12/11/2025 1:16:43 PM
Metadata
Fields
Template:
Contract
Date
11/26/2025
Contract Starting Date
11/26/2025
Contract Ending Date
12/2/2025
Contract Document Type
Contract
Amount
$229,000.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
223
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SPECIAL CONDITIONS <br /> <br /> <br />Attendant Booth Additions SC - 12 <br />Orange County, North Carolina AUGUST 2025 <br />TRC PN: 670493 <br /> <br />1. Labor required. <br />2. Equipment required. <br />3. Products required. <br /> <br />• Recommended source of purchase and unit cost. <br />• Quantities required. <br /> <br />4. Taxes, insurance and bonds. <br />5. Credit for work deleted from Contract, similarly documented. <br />6. Overhead and profit. <br />7. Justification for any change in Contract Time. <br /> <br /> <br />C. Support each claim for additional costs, and for work done on a time-and- <br />material/force account basis, with documentation as required for a lump sum <br />proposal, plus additional information. <br /> <br />1. Name of the Owner’s authorized agent who ordered the work, and date of <br />the order. <br />2. Dates and times work was performed, and by whom. <br />3. Time record, summary of hours worked, and hourly rates paid. <br />4. Receipts and invoices for: <br /> <br />• Equipment used, listing dates and times of use. <br />• Products used, listing of quantities. <br />• Subcontractors. <br /> <br />29.6 Preparation of Change Orders and Field Orders <br /> <br />A. Engineer will prepare each Change Order and Field Order. <br /> <br />B. Forms: See appropriate sections. <br /> <br />C. Change Order will describe changes in the Work, both additions and deletions, <br />with attachments of revised Contract Documents to define details of the change. <br /> <br />D. Change Order will provide an accounting of the adjustment in the Contract Cum <br />and in the Contract Time. <br /> <br />E. Field Order will describe interpretations or clarifications of Contract Documents, <br />order minor changes in the Work, and/or memorialize trade-off agreements. <br /> <br />29.7 Lump Sum/Fixed Price Change Order <br /> <br />A. Content of Change Orders will be based on, either: <br /> <br />1. Engineer’s Proposal Request and Contractor’s responsive Proposal as <br />mutually agreed between Owner and Contractor. <br />2. Contractor’s Proposal for a change, as recommended by Engineer. <br /> <br />Docusign Envelope ID: 34F94CE0-2CE8-49C5-B7C4-6B696F8E23C3
The URL can be used to link to this page
Your browser does not support the video tag.