Browse
Search
2025-722-E-Solid Waste-Central Builder Inc. of Mebane-Booth installation
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2025
>
2025-722-E-Solid Waste-Central Builder Inc. of Mebane-Booth installation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2025 1:20:16 PM
Creation date
12/11/2025 1:16:43 PM
Metadata
Fields
Template:
Contract
Date
11/26/2025
Contract Starting Date
11/26/2025
Contract Ending Date
12/2/2025
Contract Document Type
Contract
Amount
$229,000.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
223
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SPECIAL CONDITIONS <br /> <br /> <br />Attendant Booth Additions SC - 9 <br />Orange County, North Carolina AUGUST 2025 <br />TRC PN: 670493 <br /> <br />A. Fill in required information, including that for Change Orders executed prior to <br />date of submittal of application. <br /> <br />B. Fill in summary of dollar values to agree with respective totals indicated on <br />continuation sheets. <br /> <br />Continuation Sheets <br /> <br />A. Fill in total list of all scheduled component items of Work, with item number and <br />scheduled dollar value for each item <br /> <br />B. Fill in dollar value in each column for each scheduled line item when work has <br />been performed or products stored. <br /> <br />1. Round off values to nearest dollar, or as specified for Schedule of Value. <br /> <br />C. List each Change Order executed prior to date of submission., at the end of the <br />continuation sheets. <br /> <br />1. List by Change Order Number and description, as for an original <br />component item of work. <br /> <br />D. To receive approval for payment on component material stored on site, submit <br />copies of the original paid invoices with the application for payment. <br /> <br />28.4 When the Owner or the Engineer requires substantiating data, Contractor shall submit <br />suitable information, with a cover letter identifying. <br /> <br />A. Project <br /> <br />B. Application number and date. <br /> <br />C. Detailed list of enclosures. <br /> <br />1. Item number and identification as shown on application. <br />2. Description of specific material. <br /> <br />D. Submit one copy of data and cover letter for each copy of application. <br /> <br />E The Contractor is to maintain an updated set of drawings to be used as record <br />drawings. As a prerequisite for monthly progress payments, the Contractor is to <br />exhibit the updated record drawings for review by the Owner and the Engineer. <br /> <br />F. Contractor shall maintain an updated construction schedule. As a prerequisite <br />for monthly progress payments, Contractor shall submit the updated construction <br />schedule with the applications for progress payments. If the contractor fails to <br />submit the required updated schedule within the time prescribed, the Engineer <br />may withhold approval of progress payment estimates until such time as the <br />Contractor submits the required updated schedule. Submit one copy for each <br />copy of application. <br />Docusign Envelope ID: 34F94CE0-2CE8-49C5-B7C4-6B696F8E23C3
The URL can be used to link to this page
Your browser does not support the video tag.