Orange County NC Website
Mr. Bruce Woody <br />June 03, 2025 <br />Page 3 <br /> <br />▪ samples obtained from nine monitoring wells associated with the sanitary landfill (6801-MW4, <br />6801-MW14A, 6801-MW14B, 6801-MW15, 6801-MW16, 6801-MW20, 6801-MW21S, 6801- <br />MW21D, 6801-MW22), for the constituents listed in 40 CFR Part 258 Appendix II (15A NCAC <br />13B.1600) <br />▪ samples obtained from four “nature and extent” monitoring wells (6801-MW21D2, 6801-MW23, <br />6801-MW24, 6801-MW301), for the constituents listed in 40 CFR Part 258 Appendix I (15A NCAC <br />13B .1600), plus those constituents listed in Appendix II that have been previously and reliably <br />detected at this facility (mercury, naphthalene, sulfide) <br />▪ samples obtained from four wells (6801-MW21S, 6801-MW21D, 6801-MW23, 6801-MW24) for <br />chloride, carbon dioxide, manganese, potassium <br />▪ samples obtained from nine monitoring wells (6801-MW04, 6801-MW110S, 6801-MW110D, <br />6801-MW21S, 6801-MW21D, 6801-MW21D2, 6801-MW23, 6801-MW24, 6801-MW301) for <br />hexavalent chromium <br />▪ samples of surface water obtained from two locations along Old Field Creek, for the constituents <br />listed in 40 CFR Part 258 Appendix II (15A NCAC 13B .1600) <br />▪ additional samples obtained from well MW-04 for constituents required by regulations for <br />monitoring of C&D landfills (manganese, iron, chloride, sulfate, total dissolved solids, alkalinity) <br />▪ additional samples obtained from well MW-04 for quality control parameters (MS/MSD) <br /> <br />TRC will prepare a digital version (Adobe Acrobat or functional equivalent) of the report and provide it to <br />OCSWM and to NC- DEQ. Additionally, all EDDs will be compiled and submitted to the state’s EQUIS <br />database per DEQ requirements. This action was previously covered under the regulatory task. <br /> <br /> <br />Task-03– PFAS Sampling and Analysis – If Necessary <br /> <br />A memorandum dated March 13, 2023, by North Carolina Department of Environmental Quality (NCDEQ) <br />Division of Waste Management (DWM), Solid Waste Section (Section), stated that all groundwater, surface <br />water, and leachate samples collected at solid waste sanitary landfills after July 1, 2023, are required to be <br />analyzed for per- and polyfluorinated substances (PFAS). Per this requirement, PFAS sampling and analysis <br />was completed at the North Landfill during the 2023 S2 and 2024 S1 sampling events. Results of the PFAS <br />analysis were submitted to the NCDEQ under separate cover with the regularly submitted semi-annual <br />monitoring reports. Upon review of the PFAS analysis results, the NCDEQ may require additional analysis <br />for PFAS at select and/or all monitoring wells at the North Landfill facility. Accordingly, laboratory costs <br />for additional PFAS analysis during the upcoming 2025 S2 and 2026 S1 sampling events is included as a <br />separate line item until further direction from the NCDEQ. <br /> <br /> <br /> <br /> <br /> <br />Docusign Envelope ID: 174C8FB9-37C8-4E30-AECB-BF3B9992AAC6