Orange County NC Website
18 <br /> Slide#6 <br /> Major Subdivision Review Process <br /> ConceptPlan <br /> •General!ot <br /> layout and <br /> road design <br /> established <br /> Plan for <br /> utilities and <br /> services <br /> Development <br /> �1 <br /> ORANGE COUNTY <br /> NORTH CAROLINA <br /> Taylor Perschau said the Board will be looking at a concept plan this evening. <br /> Slide#7 <br /> Major Subdivision Review Process <br /> Pre <br /> 1iminaary Vial Final Plat <br /> General lot •Exact lot •All required <br /> layout and boundaries improvements <br /> road design and roadway are completed <br /> established engineering or bonded <br /> Plan for completed •All permitting <br /> utilities and •Permitting and needs <br /> services design for identified in <br /> utilities earlier review <br /> completed phases are <br /> complete and <br /> submitted to <br /> County <br /> Development <br /> MWWWWM <br /> ORANGE COUNTY <br /> NORTH CAROLINA <br /> Taylor Perschau explained that every type of major subdivision, whether standard or <br /> conditional district rezoning, goes through the three-step process detailed on the slide.A concept <br /> plan is a general layout and general road design, and it does come up with a plan for utilities and <br /> services, but it does not engineer those utilities and services. She explained that if the rezoning <br />