Orange County NC Website
fJ-COG <br />Worksheet 7 -External Costs <br />Projected Period <br />For imtruGions, see Appead'oc A of hntrnctions Fa FCC Form 1?AO <br />Qoeslion 1. For which time period are you ~ out ~ cvorlaheet7 [Put m "X" in the appropriate box.] <br />Quwoion 2 How long is the Errt period, in moodm, for which rata ate being set wi9r drim wodudteet7 <br />Qnation 3. How krog is the second period, is , for which rata are being set wish this workaho~t <br />CATV R ation <br />34 <br />Tine-Up Period Projected Period <br /> X <br /> <br /> 12 <br /> 0 <br />• c e <br />Lice Idae 1)aeriprtion Basie Tkr 2 Tler 3 Tier 4 Tier S <br />Period t <br />Ezternal Costa E ' 'ble for Marku <br />Coat of Programming For Chmnds Addod <br />701 Prior to 5115/94 or After 5/15194 Using <br />Marlnrp Method For Period <br />571,37253 <br />702 Rehm-smiasion Consent Fees For Period <br />703 Copyright Fes For Period 56,027.86 <br />704 External Coals Eligible For 7.5% Markup 577,400.39 <br />705 Marked Up Eternal Cosh 583,205.4193 <br />Ezternal Costs Not EI' 'ble for Marko <br />706 Gble Sped Taus For Period <br />707 Franchise ReLUed Coats For Period <br />708 Coon Regulatory Fea For Period 50.00 <br />709 Toad External Coats For Permd 583,205.4193 <br />710 ~ Per-Subsctrber Es<ernal Costs For <br />Period 1 51.1451 <br />Page 2 FCC Form 1240, July 1996 <br />