Browse
Search
Agenda - 04-01-2003-9b
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2003
>
Agenda - 04-01-2003
>
Agenda - 04-01-2003-9b
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2008 4:48:25 PM
Creation date
8/29/2008 10:45:10 AM
Metadata
Fields
Template:
BOCC
Date
4/1/2003
Document Type
Agenda
Agenda Item
9b
Document Relationships
Minutes - 20030401
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2003
S Adoption of 2003 Rate Order for Cable Services in Unincorporated Orange County
(Linked From)
Path:
\Board of County Commissioners\Various Documents\2000 - 2009\2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~~ <br />slight decrease in equipment charges, the HSC rate increased dramatically. <br />TW FCC1205 National E ui ment &HSC rates <br />FCC1205 2001 2002 2003 Delta <br /> regional national national <br />HSC $28.39 $35.83 $37.62 $1.79 <br />Remote Control $0.28 $0.35 $0.35 $0.00 <br />Addressable 1 $4.26 $8.49 $7.34 ($1.15) <br />Non-addressable 2 $0.93 $0.68 $0.59 ($0.09) <br />Time Warner aggregated its equipment and installation expenses on a national basis to establish a <br />uniform rate structure in its 3000 franchises. In additi~ ble list lthe differetncesin the amount of <br />installation services are tied to the HSC rate. The next _ <br />time required to install cable service in 2001 versus 2002~aecS oed~eg nt North Carol na "regionals <br />Schedule D. The 2001 installation average insta~ldaeian tie ated measurements. <br />values where as the 2002 values are Company- g~' g <br />Schedule D: Avera <br />Activity 2001 <br />FCC1205 NC <br />regional <br />Average Hours per Unwired 0.96 <br />Home Installation <br />Average Hours per Pre-wired <br />Home Installation <br />Average Hours per Additional <br />Connection at time of <br />Installation <br />Average Hours per Additional <br />Connection Requiring <br />Separate Installation <br />0.84 <br />0.55 <br />0.73 <br />Hours* <br />2002 <br />FCC 1205 <br />company <br />1.20 <br />Installation <br />2003 <br />FCC1205 <br />company <br />1.22 <br />0.85 0.85 <br />0.54 0.53 <br />0.85 ~ 0.84 <br />*time in hours is expressed as decimal equivalents <br />Delta % change <br />+/- <br />0.02 2.08% <br />0.00 0.00% <br />-0.01 -1.82% <br />-0.01 ~ -1.37% <br />Time Warner did not provide documentation to support the basis for Total Maintenance Hours <br />(Schedule C(B)), the average time required to wire a home (Schedule D(A)), time required to <br />complete a "pre-wire" (Schedule D(B), extra average time required to install an additional outlet <br />simultaneously with a primary installation (Schedule D(C), average time required to install an <br />additional outlet subsequent to the primary installation (Schedule D(D)), average time to perform <br />Action Audits, LLC Cable Rate, Franchise Fee, Utili Tax Auditin & Telecommunication Administration <br />101 Pocono Lane, Cary, North Carolina 27513-5316 Voice # 919.467.5392 Fax # 919.460.6868 <br />
The URL can be used to link to this page
Your browser does not support the video tag.